Plenary sitting

 

A7-0150/2012

2.5.2012

***I

REPORT

on the proposal for a regulation of the European Parliament and of the Council amending Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

( COM(2011)0659 – C7‑0372/2011 – 2011/0301(COD) )

Committee on Budgets

Rapporteur: Göran Färm

PR_COD_1amCom

 

 

Symbols for procedures

  *  Consultation procedure

  ***  Consent procedure

  ***I  Ordinary legislative procedure (first reading)

  ***II  Ordinary legislative procedure (second reading)

  ***III  Ordinary legislative procedure (third reading)

 

(The type of procedure depends on the legal basis proposed by the draft act.)

 

 

 

 

 

Amendments to a draft act

In amendments by Parliament, amendments to draft acts are highlighted in bold italics. Highlighting in normal italics is an indication for the relevant departments showing parts of the draft act which may require correction when the final text is prepared – for instance, obvious errors or omissions in a language version. Suggested corrections of this kind are subject to the agreement of the departments concerned.

 

The heading for any amendment to an existing act that the draft act seeks to amend includes a third line identifying the existing act and a fourth line identifying the provision in that act that Parliament wishes to amend. Passages in an existing act that Parliament wishes to amend, but that the draft act has left unchanged, are highlighted in bold. Any deletions that Parliament wishes to make in such passages are indicated thus: [...].

 

 

 

CONTENTS

Page

DRAFT EUROPEAN PARLIAMENT LEGISLATIVE RESOLUTION  5

EXPLANATORY STATEMENT  22

OPINION of the Committee on Industry, Research and Energy  26

OPINION of the Committee on Transport and Tourism  43

PROCEDURE  55

 

 

DRAFT EUROPEAN PARLIAMENT LEGISLATIVE RESOLUTION

on the proposal for a regulation of the European Parliament and of the Council amending Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

( COM(2011)0659 – C7‑0372/2011 – 2011/0301(COD) )

(Ordinary legislative procedure: first reading)

The European Parliament,

–  having regard to the Commission proposal to Parliament and the Council ( COM(2011)0659 ),

–  having regard to Article 294(2) and Articles 172 and 173(3) of the Treaty on the Functioning of the European Union, pursuant to which the Commission submitted the proposal to Parliament (C7‑0372/2011),

–  having regard to Article 294(3) of the Treaty on the Functioning of the European Union,

–  having regard to the opinion of the European Economic and Social Committee[1],

–  having regard to the opinion of the Committee of the Regions[2],

–  having regard to Rule 55 of its Rules of Procedure,

–  having regard to the report of the Committee on Budgets and the opinions of the Committee on Industry, Research and Energy and the Committee on Transport and Tourism ( A7-0150/2012 ),

1.  Adopts its position at first reading hereinafter set out;

2.  Calls on the Commission to refer the matter to Parliament again if it intends to amend its proposal substantially or replace it with another text;

3.  Instructs its President to forward its position to the Council, the Commission and the national parliaments.

 

Amendment    1

Proposal for a regulation

Recital 3

 

Text proposed by the Commission

Amendment

(3) Over the next decade, unprecedented investment volumes in Europe's transport, energy, information and communication networks will be needed in order to underpin the Europe 2020 flagship actions and develop smart, upgraded and fully interconnected infrastructures to foster the completion of the internal market. Estimated investment needs of the TEN-T network amount to EUR 500 billion. Among energy infrastructure projects of European relevance, approximately EUR 100 billion of investments is at risk of not being delivered due to obstacles related to permit granting, regulation and financing, while another EUR 100 billion will be financed by the sector itself. Investment needs for achieving the Digital Agenda objective of providing fast internet access for all European citizens and businesses range from EUR 181 to EUR 273 billion, of which private sector investment is expected to amount to between EUR 30 billion and EUR 100 billion.

(3) Over the next decade, unprecedented investment volumes in Europe's transport, energy, information and communication networks will be needed in order to underpin the Europe 2020 flagship actions and develop smart, upgraded and fully interconnected infrastructures to foster the completion of the internal market. Estimated investment needs of the TEN-T network amount to EUR 500 billion. Among energy infrastructure projects of European relevance, approximately EUR 100 billion of investments is at risk of not being delivered due to obstacles related to permit granting, regulation and financing, while another EUR 100 billion will be financed by the sector itself. Investment needs for achieving the Digital Agenda objective of providing fast internet access for all European citizens and businesses range from EUR 181 to EUR 273 billion, of which private sector investment is expected to amount to between EUR 30 billion and EUR 100 billion. It should be ensured, however, that EU-funded transport infrastructure takes into account energy-efficiency needs, noise reduction at source, biodiversity and climate-change challenges.

 

Amendment    2

Proposal for a regulation

Recital 5

 

Text proposed by the Commission

Amendment

(5) Financial instruments can improve the efficiency of budget spending and achieve high multiplier effects in terms of attracting private sector financing and achieved investment volumes. The expected multiplier effect of the Europe 2020 Project Bond Initiative is 15-20.

(5) Financial instruments as governed by the Financial Regulation1 can in some cases improve the efficiency of budget spending and achieve high multiplier effects in terms of attracting private sector financing, especially in the context of difficult access to credit and the current constraints on public finances. The Commission should, in particular, ensure that the pilot phase for the Europe 2020 Project Bond Initiative offers added value, by achieving higher investment volumes. The expected multiplier effect of the Europe 2020 Project Bond Initiative is 15-20.

 

_________________

 

1 Council Regulation (EU, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities (OJ L 248, 16.9.2002, p. 1).

 

Amendment    3

Proposal for a regulation

Recital 5 a (new)

 

Text proposed by the Commission

Amendment

 

(5a) Given the magnitude of investment needs and the objectives defined in the Europe 2020 strategy over the next decade, the Commission should, if the Europe 2020 Project Bond Initiative proves successful, step up the Union's effort toward leveraging and attracting additional funding.

 

Amendment    4

Proposal for a regulation

Recital 7

 

Text proposed by the Commission

Amendment

(7) The Europe 2020 Project Bond Initiative has a double objective : first to help finance projects of European policy priorities, and second, to facilitate greater private sector involvement in the long-term capital market financing of infrastructure projects. It will redirect some EU budget spending towards growth-enhancing areas, taking into account the Unions budgetary discipline and the ceilings under the current Multiannual Financial Framework.

(7) The pilot phase for the Europe 2020 Project Bond Initiative has a double objective: first, to help finance projects of European policy priorities, and second, to facilitate greater private sector involvement in the long-term capital market financing of infrastructure projects, in particular through providing the requisite credit enhancement to attract capital market investors. It will redirect some EU budget spending towards growth-enhancing areas, particularly transport, energy and telecommunications infrastructure, taking into account the Union’s budgetary discipline and the ceilings under the current Multiannual Financial Framework.

 

Amendment    5

Proposal for a regulation

Recital 8

 

Text proposed by the Commission

Amendment

(8) It will be the first financial instrument benefiting infrastructure projects with similar financing needs across several sectors and will as such produce higher benefits in terms of market impact, administrative efficiency and resource utilisation. It will provide a coherent instrument to infrastructure stakeholders such as financiers, public authorities, construction companies and operators.

(8) It will be the first financial instrument benefiting infrastructure projects with similar financing needs across several sectors and will as such produce higher benefits in terms of market impact, administrative efficiency and resource utilisation, thanks to the possible synergies between the transport, energy and ICT sectors. It will provide a coherent instrument to infrastructure stakeholders such as financiers, public authorities, construction companies and operators.

 

Amendment    6

Proposal for a regulation

Recital 9

 

Text proposed by the Commission

Amendment

(9) With the Europe 2020 Project Bond Initiative, bonds would be issued by project companies, the Union budget together with financing from a financial partner would be used to improve the credit quality of the bonds in order to attract debt capital market investors such as pension funds and insurance companies.

(9) With the Europe 2020 Project Bond Initiative, bonds would be issued by project companies, the Union budget together with financing from a financial partner would be used to improve the credit quality of the bonds in order to attract debt capital market investors such as pension funds, insurance companies and other interested parties.

 

Amendment    7

Proposal for a regulation

Recital 10

 

Text proposed by the Commission

Amendment

(10) The Union support should mitigate the risk inherent in project bonds to the extent that capital market participants are willing to invest in a larger volume infrastructure project bonds than would be possible without Union support.

(10) The Union support provided by means of this Regulation should mitigate the risk inherent in project bonds to the extent that capital market participants are willing to invest in a larger volume infrastructure project bonds than would be possible without Union support.

 

Amendment    8

Proposal for a regulation

Recital 11

 

Text proposed by the Commission

Amendment

(11) Europe's economic recovery should not be compromised by growing transport congestion, missing energy links and a slowing down of broadband penetration due to infrastructure projects' difficulties in gaining access to long-term private finance or public funding.

(11) Europe's economic recovery should not be compromised by deteriorating performance on the part of transport, missing energy links, outdated energy systems, deficiency in energy supply, a slowing down of broadband penetration and incapacitation of telecommunication services due to infrastructure projects' difficulties in gaining access to long-term private finance or public funding.

 

Amendment    9

Proposal for a regulation

Recital 12

 

Text proposed by the Commission

Amendment

(12) The reassessment of infrastructure investment programmes by Member States in the context of their fiscal austerity and structural reforms will not facilitate the required acceleration of the pace of infrastructure investment. In addition, long-term bank lending for infrastructure projects continues to be insufficient and expensive, calling for alternative and competitive sources of debt financing.

(12) The reassessment of infrastructure investment programmes by Member States in the context of their fiscal austerity and structural reforms will not facilitate the acceleration of the pace of infrastructure investment needed to meet the policy objectives of the Europe 2020 strategy, in particular a shift towards a resource-efficient, low-carbon economy to achieve sustainable growth, as laid down in the Europe 2020 resource efficiency flagship initiative. In addition, long-term bank lending for infrastructure projects continues to be insufficient and expensive, calling for alternative and competitive sources of debt financing.

 

Amendment    10

Proposal for a regulation

Recital 14

 

Text proposed by the Commission

Amendment

(14) Therefore, a pilot phase for the Europe 2020 Project Bond Initiative should be launched during the current financial framework in order to develop debt capital market financing in the area of infrastructure more generally and to extend the range of financial instruments currently available for transport projects.

(14) Therefore, a pilot phase for the Europe 2020 Project Bond Initiative should be launched during the current financial framework in order to ascertain whether, and to what extent, such risk-sharing financial instruments offer additional benefits in the area of infrastructure financing.

 

Amendment    11

Proposal for a regulation

Recital 15

 

Text proposed by the Commission

Amendment

(15) In order to implement the pilot phase of the Europe 2020 Project Bond Initiative, Decision No 1639/2006/EC and Regulation (EC) No 680/2007 should be amended. This pilot phase aims to support infrastructure projects with commercial potential in the transport, energy and ICT sectors, while after 2013 the initiative may be extended to other sectors.

(15) In order to implement the pilot phase of the Europe 2020 Project Bond Initiative, Decision No 1639/2006/EC and Regulation (EC) No 680/2007 should be amended. This pilot phase aims to support infrastructure projects with a clear European added value and commercial potential in the transport, energy and ICT sectors, which, despite their commercial potential, do not receive adequate financing from the market.

 

Amendment    12

Proposal for a regulation

Recital 16

 

Text proposed by the Commission

Amendment

(16) In light of the EIB's long-standing expertise and as the major financier of infrastructure projects and given its nature as the EU financial body established by the Treaty, the Commission should involve the EIB in the implementation of this pilot phase. The specific terms and conditions of the co-operation including risk-sharing and remuneration of the EIB, should be laid down in an agreement between the Commission and the EIB.

(16) In light of the EIB's long-standing expertise and as the major financier of infrastructure projects and given its nature as the EU financial body established by the Treaty, the Commission should involve the EIB in the implementation of this pilot phase. It is necessary to lay down the specific terms and conditions of the co-operation, including risk-sharing and remuneration of the EIB, in an agreement between the Commission and the EIB.

 

Amendment    13

Proposal for a regulation

Recital 17

 

Text proposed by the Commission

Amendment

(17) The pilot phase of the Europe 2020 Project Bond Initiative should be launched in preparation of the proposed Connecting Europe Facility. This pilot phase will help to pave the way for the risk-sharing financial instrument under the Connecting Europe Facility.

(17) The pilot phase of the Europe 2020 Project Bond Initiative is without prejudice to the decision concerning the Union’s Multiannual Financial Framework (MFF) after 2013 and should be launched no later than 31 July 2012 in preparation for the proposed Connecting Europe Facility. This pilot phase, should it prove successful, and following appropriate analysis and independent evaluation, will help to pave the way for the risk-sharing financial instrument under the Connecting Europe Facility.

 

Amendment    14

Proposal for a regulation

Recital 20

 

Text proposed by the Commission

Amendment

(20) Budgetary funds should be requested by the EIB on the basis of a range of projects, which the EIB would deem suitable and likely to be realised. Any such requests should be made prior to 31 December 2013. Due to the complexity of large infrastructure projects, the actual approval might take place at a later date, but no later than 31 December 2014.

(20) Budgetary funds should be requested by the EIB on the basis of a range of projects, which the EIB and the Commission would deem suitable, in line with the Union's long term policy objectives and likely to be realised. Any such requests should be made prior to 31 December 2013. Due to the complexity of large infrastructure projects, the actual approval might take place at a later date, but no later than 31 December 2014.

 

Amendment    15

Proposal for a regulation

Recital 20 a (new)

 

Text proposed by the Commission

Amendment

 

(20a) It is desirable that the Commission should perform an independent, in-depth assessment of the pilot phase of the risk-sharing instrument for project bonds. That assessment must, if appropriate, be accompanied by legislative proposals on innovative financial instruments in the context of the Multiannual Financial Framework for the period 2014-2020.

 

Amendment    16

Proposal for a regulation

Recital 20 b (new)

 

Text proposed by the Commission

Amendment

 

(20b) Since, in the conclusions of the European Council of 1-2 March 2012, a deadline of June 2012 was set for reaching an agreement on the pilot phase of the Europe 2020 Project Bond Initiative, the Commission needs to start implementing that pilot phase without further delay.

 

Amendment    17

Proposal for a regulation

Article 1 – point -1 (new)

Decision No 1639/2006/EC

Article 8 – paragraphs 5 a and 5 b (new)

 

Text proposed by the Commission

Amendment

 

-1. In Article 8, the following paragraphs are added:

 

"5a. A full-scale independent evaluation of the pilot phase of the risk-sharing instrument for project bonds referred to in paragraphs 2a to 2db of Article 31 shall be undertaken, which shall cover, inter alia, its added value, including the impact on the financial viability of the project, additionality compared to other Union or Member State instruments and any other long-term debt financing, and the multiplier effect achieved. It shall include general observations on market developments, including the creation or correction of distortive effects, if any, and an assessment of the risks involved including project and partner risk. It shall also consider whether a maximum rate of return would be appropriate for private-sector investor funding of public projects, and shall provide a cost comparison with alternative means of project finance including bank loans and equity.

 

5b. Furthermore, on the basis of that evaluation, the Commission shall carry out an assessment of future steps to be taken in order to enhance the efficiency of Union spending as well as to increase investment volumes towards priority projects. That assessment shall examine, inter alia, how to make the project bond instrument even more attractive to a wider range of long-term investors, including public-sector investors."

 

Amendment    18

Proposal for a regulation

Article 1 – point 2 – point a

Decision No 1639/2006/EC

Article 31 – paragraph 2 – subparagraph 3

 

Text proposed by the Commission

Amendment

Alternatively, the Union may make a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds referred to in paragraphs 2a to 2d.

Alternatively, the Union may make, during a pilot phase in 2012 and 2013, a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds referred to in paragraphs 2a to 2db.

 

Amendment    19

Proposal for a regulation

Article 1 – point 2 – point b – introductory wording

 

Text proposed by the Commission

Amendment

(b) The following paragraphs 2a to 2d are inserted:

(b) The following paragraphs 2a to 2db are inserted:

 

Amendment    20

Proposal for a regulation

Article 1 – point 2 – point b

Decision No 1639/2006/EC

Article 31 – paragraph 2a

 

Text proposed by the Commission

Amendment

2a. Risk-sharing instrument for project bonds means a credit enhancement which fulfils the following criteria:

2a. Risk-sharing instrument for project bonds means a joint instrument by the Commission and the EIB providing a credit enhancement which fulfils the following criteria:

(a) takes the form of a loan or a guarantee granted by the EIB in favour of financing provided to projects in the field of ICT and broadband;

(a) takes the form of a loan or a guarantee granted by the EIB, with the support of a Union budget contribution, in favour of financing provided to projects of common European interest in the field of ICT and broadband, complementing financing by Member States or private investors and addressing sub-optimal investment situations when projects do not receive adequate financing from the market;

(b) covers the debt service risk of a project and mitigates the credit-risk of bond holders;

(b) covers the debt service risk of a project and mitigates the credit-risk of bond holders;

(c) is used only for projects whose financial viability is based on project revenues.

(c) is used only for projects whose financial viability is based on project revenues.

 

Amendment    21

Proposal for a regulation

Article 1 – point 2 – point b

Decision No 1639/2006/EC

Article 31 – paragraph 2b

 

Text proposed by the Commission

Amendment

2b. The Union exposure to the risk sharing instrument for project bonds, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB.

2b. The Union exposure to the risk sharing instrument for project bonds, including management fees and other eligible costs, shall in no case exceed the amount of the Union contribution to the risk-sharing instrument for project bonds. There shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall always be borne by the EIB.

 

Amendment    22

Proposal for a regulation

Article 1 – point 2 – point b

Decision No 1639/2006/EC

Article 31 – paragraph 2c

 

Text proposed by the Commission

Amendment

2c. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB.

2c. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB. The Commission shall inform the European Parliament and the Council without delay of the basic elements of that agreement.

 

Risk assessment by the EIB shall be guaranteed in accordance with the EIB Credit Risk Policy Guidelines, and the EIB's selection criteria in the social, environmental and climate field shall be duly taken into account.

 

The main terms, conditions and procedures of the risk-sharing instrument for project bonds are laid down in an Annex to this Decision.

 

Amendment    23

Proposal for a regulation

Article 1 – point 2 – point b

Decision No 1639/2006/EC

Article 31 – paragraph 2 d a (new) and 2 d b (new)

 

Text proposed by the Commission

Amendment

 

2da. In addition to the reporting requirements set out in point 49 of the Interinstitutional Agreement of 17 May 2006 on budgetary discipline and sound financial management, and without prejudice to any other regulatory reporting requirements, the Commission shall report to the European Parliament and the Council every six months during the pilot phase. Such reporting shall include the provision of information regarding the performance of the risk-sharing instrument for project bonds and recommendations regarding ways of enhancing its effectiveness.

 

2db. On the basis of the evaluation referred to in Article 8(5a) of this Decision, the Commission shall propose appropriate regulatory changes, including legislative ones, in particular if the predicted market uptake is not satisfactory or in the event that alternative sources of long-term debt financing become sufficiently available.

 

Amendment    24

Proposal for a regulation

Article 2 – point 1

Regulation (EC) No 680/2007

Article 2 – point 14

 

Text proposed by the Commission

Amendment

14. 'risk-sharing instrument for project bonds' means a credit enhancement provided to projects of common interest. The risk-sharing instrument for project bonds covers the debt service risk of a project and mitigates the credit-risk of bond holders. It is used only for projects whose financial viability is based on project revenues.

14. 'risk-sharing instrument for project bonds' means a joint instrument by the Commission and the EIB which provides a credit enhancement to projects of common interest with European added value, complementing financing by Member States or private investors and addressing sub-optimal investment situations when projects do not receive adequate financing from the market. The risk-sharing instrument for project bonds covers the debt service risk of a project and mitigates the credit-risk of bond holders. It is used only for projects whose financial viability is based on project revenues.

 

Amendment    25

Proposal for a regulation

Article 2 – point 1

Regulation (EC) No 680/2007

Article 2 – point 15

 

Text proposed by the Commission

Amendment

15. 'Credit enhancement' means the use of an EIB loan or an EIB guarantee to improve the credit quality of the project debt.

15. 'Credit enhancement' means the use of an EIB loan or an EIB guarantee, supported by a contribution from the Union budget, to improve the credit quality of the project debt.

 

Amendment    26

Proposal for a regulation

Article 2 – point 3 – point a

Regulation (EC) No 680/2007

Article 6 – paragraph 1 – point d – last sentence

 

Text proposed by the Commission

Amendment

In 2012 and 2013, an amount of up to EUR 200 million may be redeployed for the risk-sharing instrument for project bonds in the transport sector.

In 2012 and 2013, an amount of up to EUR 200 million may be redeployed for the pilot phase of the risk-sharing instrument for project bonds in the transport sector.

 

Amendment    27

Proposal for a regulation

Article 2 – point 3 – point b

Regulation (EC) No 680/2007

Article 6 – paragraph 1 – point g

 

Text proposed by the Commission

Amendment

(g) a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds in the field of TEN-T and TEN-E. The Union exposure to the risk sharing instrument, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB. In 2012 and 2013, an amount of up to EUR 210 million, of which up to EUR 200 million for transport projects and up to EUR 10 million for energy projects, may be redeployed for the risk-sharing instrument for project bonds in accordance with the procedure referred to in Article 15(2) from the TEN-T (LGTT) and TEN-E budget lines, respectively. The risk-sharing instrument for project bonds may reuse any revenues received within the investment period for new loans and guarantees.

(g) during a pilot phase in 2012 and 2013, a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds in the field of TEN-T and TEN-E. The Union exposure to the risk sharing instrument, including management fees and other eligible costs, shall in no case exceed the amount of the Union contribution to the risk-sharing instrument for project bonds, nor extend beyond the duration of the bonds. There shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall always be borne by the EIB. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB. The Commission shall inform the European Parliament and the Council without delay of the basic elements of that agreement. Risk assessment by the EIB shall be guaranteed in accordance with the EIB Credit Risk Policy Guidelines, and the EIB's selection criteria in the social, environmental and climate field shall be duly taken into account.

 

In 2012 and 2013, an amount of up to EUR 210 million, of which up to EUR 200 million for transport projects and up to EUR 10 million for energy projects, may be redeployed for the risk-sharing instrument for project bonds in accordance with the procedure referred to in Article 15(2) from the TEN-T (LGTT) and TEN-E budget lines, respectively. In addition to the reporting requirements set out in point 49 of the Interinstitutional Agreement of 17 May 2006 on budgetary discipline and sound financial management, and without prejudice to any other regulatory reporting requirements, the Commission shall report to the European Parliament and the Council every six months during the pilot phase. Such reporting shall include the provision of information regarding the performance of the risk-sharing instrument for project bonds and recommendations regarding ways of enhancing its effectiveness.

 

On the basis of the evaluation referred to in Article 16(2a) of this Regulation, the Commission shall propose appropriate regulatory changes, including legislative ones, in particular if the predicted market uptake is not satisfactory or in the event that alternative sources of long-term debt financing become sufficiently available.

 

Interest and other revenue generated by the risk-sharing instrument for project bonds in the form of commission paid by the beneficiaries which is received before 31 December 2013 may be reused for new loans and guarantees. After 1 January 2014, if the risk-sharing instrument for project bonds is not extended into the next financial framework, any remaining funds shall be returned to the revenue side of the general budget of the Union.

 

Amendment    28

Proposal for a regulation

Article 2 – point 3 a (new)

Regulation (EC) No 680/2007

Article 16 – paragraphs 2 a and 2 b (new)

 

Text proposed by the Commission

Amendment

 

(3a) In Article 16, the following paragraphs are added:

 

"2a. A full-scale independent evaluation of the pilot phase of the risk-sharing instrument for project bonds referred to in point (g) of Article 6(1) shall be undertaken, which shall cover, inter alia, its added value, including the impact on the financial viability of the project, additionality compared to other Union or Member State instruments and any other long-term debt financing, and the multiplier effect achieved. It shall include general observations on market developments including the creation or correction of distortive effects, if any, and an assessment of the risks involved including project and partner risk. It shall also consider whether a maximum rate of return would be appropriate for private sector investor funding of public projects and shall provide a cost comparison with alternative means of project finance, including bank loans and equity.

 

2b. Furthermore, on the basis of that evaluation, the Commission shall carry out an assessment of future steps to be taken in order to enhance the efficiency of Union spending as well as to increase investment volumes towards priority projects. That assessment shall examine, inter alia, how to make the project bond instrument even more attractive to a wider range of long-term investors, including public-sector investors."

 

Amendment    29

Proposal for a regulation

Article 2 – point 3 b (new)

Regulation (EC) No 680/2007

Article 17 – paragraph 1 – subparagraph 1 a (new)

 

Text proposed by the Commission

Amendment

 

(3b) In Article 17(1), the following subparagraph is added:

 

'Before 30 June 2013, the Commission shall submit to the European Parliament and the Council a report containing a list of the projects selected for the financial aid referred to in point (g) of Article 6(1), specifying the contribution, the financing institutions and the investors involved. The Commission shall include in that report a good practice guide and a list of investors potentially interested in innovative financial instruments.'

Justification

Precise information from the pilot Project Bonds phase is needed to identify the changes that might be made to the Connecting Europe Facility. The Commission should inform Parliament which investors are involved and how the selected projects can be improved.

 

 

 

EXPLANATORY STATEMENT

 

Introduction: why a pilot phase for project bonds?

 

A modern and effective infrastructure is of key importance for achieving the Europe 2020 objectives of smart, sustainable and inclusive growth as well as reducing unemployment through the completion of the internal market. Investment needs in the field of transport, energy and Information and Communication Technologies (ICT) infrastructure in Europe are estimated at EUR 1.5 trillion for 2010-2020. While the private sector should finance the main part of these - mostly profitable - investments, the public sector's role in Europe will be crucial for achieving the above targets.

 

To this aim, the EU Commission has proposed a 'Connecting Europe Facility' (CEF) for the next financial framework in order to accelerate infrastructure development in the fields of transport, energy and ICT networks, with particular emphasis on strategic cross-border parts.

 

In addition to equity instruments and grants, CEF includes a new financial instrument to mobilise more private sector funding, project bonds. In order for project bonds to become fully operational in 2014, the Commission proposes a pilot phase for 2012-2013, mainly aiming at:

- testing financial markets' acceptance and reactions to the initiative, since new instruments take time to be incorporated in private sector investment decisions;

- testing the functioning and optimisation of project bonds in practice in order to fine-tune the initiative.

 

Through amending the current CIP and TEN rules, the proposal extends and upgrades the present Loan Guarantee Facility for TEN Transport (LGTT). It is upgraded to cover other sectors than transport, including energy and ICT-projects, whilst at the same time being extended to cover not only traffic risk, but all risks possibly leading to a shortfall of revenues in the lifecycle of a project. The time horizon of the instrument is prolonged from 3-7 years to up to 30 years. Furthermore, the new instrument addresses some shortfalls in attracting investments to which the LGTT has been unable to respond. Being set up before the crisis, the LGTT is neither designed, nor adapted to the current economic climate.

 

The establishment of this new instrument has often been strongly called for by the European Parliament, notably in its resolutions of 8 June 2011 on 'Investing in the future: a new Multiannual Financial Framework (MFF) for a competitive, sustainable and inclusive Europe'[3], 17 February 2011 on Europe 2020[4] and most recently in its resolution of 2 February 2012 on the European Council of 30 January 2012[5] and in its 15 February 2012 contribution to the Annual Growth Survey 2012[6].

 

Furthermore, the European Council in its conclusions 1/2 March 2012 sets this ambitious target for the pilot phase: 'Given the need to stimulate the private financing of key infrastructure projects, work on the pilot phase of the Europe 2020 project bond initiative should be stepped up with a view to reaching agreement by June'.

 

Technical background: how do project bonds work?

 

Project bonds are a debt instrument issued by private project companies, with the backing of an EU/EIB contribution which will make the bonds safer and more attractive to capital market investors otherwise not normally investing in infrastructure, such as pension funds. By reducing the risk taken by investors, it should stimulate the flow of private funds towards priority infrastructure investments, for which uncertain risk perceptions block the flow of finance. This is particularly important in a context of constrained bank financing resulting from the crisis and new regulatory requirements.

 

Their functioning can be summarised as follows.

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

Project

Company

 

 

(Special

purpose

vehicle)

Project

Bonds

Target rating

> A-

 

Equity &

Quasi-equity

EIB Sub debt / guarantee

Project Bond

Investor

Bond Issue and underwriting

EIB

facility

EU

contribution

up to 20%

 

of total Bond

issue

Cost

of the project

Through the use of an EIB facility, supported by an EU contribution, as subordinated debt or guarantee[7], the credit rating of private senior debt (bonds) of infrastructure projects would be enhanced, to the target rating of A-, a sufficient level to enhance the bonds' attractiveness to capital markets. The subordinated debt tranche, not exceeding 20% of the project total debt[8], will take a funded (loan) or unfunded (guarantee) form.

 

Project bonds should be considered as one tool out of a large variety of financing instruments, and can be mixed with other public and private instruments, ranging from public grants (European and national), loans (bank, bonds), guarantees, equity etc. It should however be noted that project bonds only can be used for projects expected to generate sufficient revenue. They will not replace traditional grants which instead can be focussed to those projects most in need. Project bonds are an addition to existing funding, and should not distort competition in the internal market, nor replace present private funding or any other national or EU public intervention.

 

Budgetary impact of the proposal

 

For the pilot phase, the Commission proposes an EU budget contribution of 230 million, financed through redeployment within existing programmes. Of the EUR 500 million available for LGTT in 2012-13, up to 200 million would be redeployed for supporting project bonds in the transport area. There will be no impact on the funding to other EU support like grants. In order to include investments in energy and ICT, 10 and 20 million respectively are also redeployed from the TEN-E and CIP budget lines.

 

 

 

2012 Budget

2012

2013

2014

Total

06 03 03 - Financial support for projects of common interest in the TEN-T (from LGTT budget allocation)

CA

1.275

100

100

 

200

PA

714

40

60

100

200

32 03 02 - Financial support for projects of common interest in the TEN-E

CA

21

 

10

 

10

PA

12

 

10

 

10

09 03 01 - Competitiveness and Innovation Framework Programme - ICT Policy Support Programme

CA

133

 

20

 

20

PA

109

 

20

 

20

TOTAL appropriations

for
DG MOVE, ENER and INFSO

CA

 

100

130

 

230

PA

 

40

90

100

230

 

EUR 230 million is a small sum compared to infrastructure needs, but an expected multiplier effect of up to 15 to 20 may mobilize investments of up to 4.6 billion.

 

The EU support will consist of loans / guarantees to cover any type of revenue shortfalls, for instance due to lower use than foreseen, construction delays etc. Should EU support need to be mobilised following initial revenue shortfall, it will turn into subordinated debt, still to get repaid after senior debt but before equity, meaning that any final loss for the EU budget would only occur in case of a project failure.

 

As explicitly mentioned in the legislative proposal, the risk to the EU budget would be strictly limited, with no contingent liabilities, the maximum EU contribution being capped to the amount of EUR 230 million. As to revenue stemming from the instrument, the Commission's proposal envisages that potential returns should be reinvested in the facility in order to maximise the number of supported projects. Your Rapporteur supports this line.

 

Some points of concern

 

From the budget authority's point of view a crucial point is to find the right balance between the delegated powers granted to the Commission and EIB and the reporting requirements and accountability mechanisms. In your Rapporteur's view, the proposed arrangements need some clarifications, but are sufficient for the pilot phase since:

- the selection of projects is already restricted by numerous binding criteria that the EIB will need to respect when proposing projects (EU economic policy objectives, criteria presented in the basic TEN and CIP acts, EU policy guidelines, EIB standard eligibility and environmental criteria, credit risk policies, etc),

- under both CIP and TEN, approval will follow the same procedure as traditional grants, namely through committees (see art. 15(2) in TEN and art. 46 in CIP basis acts),

- the instrument will be in force for less than 2 years and should finance only a small number of projects.

 

Further discussions in this regard may be left to the CEF proposal, leaving in the meantime the Commission and the EIB to work on fine-tuning the design of the initiative. Furthermore, given the time needed for the expected volume of projects to reach financial close and start maturing, it will take time before a proper evaluation of the initiative can be performed.

 

Given the changing economic and financial environment, we should not set too many additional criteria and implementation arrangements, in order to give greater flexibility for this new market to develop. On reporting however, and considering that the ongoing revision of the Financial Regulation is likely not to enter into force before the start of the pilot phase, your Rapporteur believes that the proposed provisions should be adjusted to ensure sufficient accountability and adequate monitoring by the legislator. He therefore proposes specific amendments aiming at a more frequent (every 6 months) and detailed reporting.

 

While it is important that adequate reporting is ensured so that well-founded conclusions can be drawn before the setting-up of the CEF, your Rapporteur underlines that the main aim of this pilot phase is to test financial markets' acceptance towards this new initiative. Against this background, and considering that the pilot phase is already limited to 18 months, your Rapporteur does not consider that an 'exit' strategy is needed for the pilot phase as the agreement and implementation of the pilot phase should in no way pre-empt the upcoming negotiations on the CEF.

 

Calendar and upcoming negotiations

 

Your Rapporteur shares the European Council's ambition to reach a first reading agreement with the Council by June at the latest and proposes the following steps in this perspective:

 

Presentation draft report

29 March

Deadline AM

3 April

Vote BUDG

25 April

Negotiation period

25/04 - 24/05

BUDG vote on political agreement

31 May (tbc)

Vote Plenary

July

 

27.3.2012

OPINION of the Committee on Industry, Research and Energy

for the Committee on Budgets

on the proposal for a regulation of the European Parliament and of the Council amending Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

( COM(2011)0659 – C7‑0372/2011 – 2011/0301(COD) )

Rapporteur: Werner Langen

 

SHORT JUSTIFICATION

The Europe 2020 Project Bond Initiative is to be launched as a pilot phase in 2012-2013 to step up private sector participation in financing infrastructure measures in the areas of transport, energy and ICT/broadband networks. At present, EU countries spend between 0.5% und 2% of GDP on infrastructure investments[9]. In future, private investors are to be involved through public-private partnerships. The Europe 2020 Project Bond Initiative will supplement existing sources of financing.

 

General remarks

 

The financing of project bonds in the pilot phase 2012-2013 will be guaranteed and capped through the redeployment of existing budget lines 06 03 03 TEN Transport (up to EUR 200 m), 32 03 02 TEN Energy (up to EUR 10 m for TEN-E projects) and 09 03 01 CIP (up to EUR 20 m for ICT and broadband projects).

 

The selection of between five and 14 different projects will be made by the EIB, on the basis of the TEN and CIP guidelines. Market distortions and quasi-subsidies are to be avoided. The purpose of the pilot phase is to test the market and assess implementation. Initial reports from the EIB to the Commission and the European Parliament on the experience gained with the implementation and market acceptance of project bonds will therefore play an important role. The EIB has an obligation to report to the Commission under the Interinstitutional Agreement. The Commission must forward these annual reports to the Council and European Parliament. The use of funds amounting to a maximum of EUR 230 m may act as a catalyst for the implementation of infrastructure measures and have a multiplier effect of around EUR 15-20 for each euro invested from the EU budget.

However, the EIB must ensure that financing is in fact provided only for those projects which are genuinely in need of funding. It must therefore select projects which are not commercially viable on their own and which consequently require financing to enable them to be implemented. In this light, some criticism might be made of the fact that, in the pilot phase, co-financing in the form of project bonds is to be provided only for projects that have been completed but require refinancing, or for projects on which work is about to start, since considerable financial planning will already have been in place for these projects before the Project Bond Initiative comes into force.

 

 

 

 

 

 

 

 

The way in which project bonds operate is illustrated in the following diagram:

 

 

Equity

 

 

EU

EIB

Project bond garantee facility

Max. 20% of total bond issue

Project bond investor

Senior Debt

(project bond)

 

 

AMENDMENTS

The Committee on Industry, Research and Energy calls on the Committee on Budgets, as the committee responsible, to incorporate the following amendments in its report:

 

Amendment    1

Proposal for a regulation – amending act

Recital 10

 

Text proposed by the Commission

Amendment

(10) The Union support should mitigate the risk inherent in project bonds to the extent that capital market participants are willing to invest in a larger volume infrastructure project bonds than would be possible without Union support.

(10) The Union support should mitigate the risk inherent in project bonds to the extent that capital market participants are willing to invest in a larger volume infrastructure project bonds than would be possible without Union support. Project bonds should be extended to innovation and demonstration projects as well.

 

 

Amendment    2

Proposal for a regulation – amending act

Recital 11

 

Text proposed by the Commission

Amendment

(11) Europe's economic recovery should not be compromised by growing transport congestion, missing energy links and a slowing down of broadband penetration due to infrastructure projects' difficulties in gaining access to long-term private finance or public funding.

(11) Europe's economic recovery should not be compromised by growing transport congestion, missing energy links, outdated energy systems, deficiency in energy supply and a slowing down of broadband penetration, incapacitation of telecommunication services due to infrastructure projects' difficulties in gaining access to long-term private finance or public funding.The Project Bonds Initiative in the framework of the EU 2020 partnership agreement shall provide a clear eligibility framework subject to enhanced democratic scrutiny as a proper means for achieving sustainable and countercyclical investments programmes consistent with EU social, climate and environmental objectives, while playing a catalytic role aiming at attracting private capital for long-term project.

 

Amendment    3

Proposal for a regulation – amending act

Recital 12

 

Text proposed by the Commission

Amendment

(12) The reassessment of infrastructure investment programmes by Member States in the context of their fiscal austerity and structural reforms will not facilitate the required acceleration of the pace of infrastructure investment. In addition, long-term bank lending for infrastructure projects continues to be insufficient and expensive, calling for alternative and competitive sources of debt financing.

(12) The reassessment of infrastructure investment programmes by Member States in the context of their fiscal austerity and structural reforms will not facilitate the required acceleration of the pace of infrastructure investment needed to meet the policy objectives of the Europe 2020 strategy, in particular a shift towards a resource-efficient, low-carbon economy to achieve sustainable growth, as laid down in the Europe 2020 resource efficiency flagship initiative. In addition, long-term bank lending for infrastructure projects continues to be insufficient and expensive, calling for alternative and competitive sources of debt financing.

 

 

Amendment    4

Proposal for a regulation – amending act

Recital 14

 

Text proposed by the Commission

Amendment

(14) Therefore, a pilot phase for the Europe 2020 Project Bond Initiative should be launched during the current financial framework in order to develop debt capital market financing in the area of infrastructure more generally and to extend the range of financial instruments currently available for transport projects.

(14) Therefore, a pilot phase for the Europe 2020 Project Bond Initiative should be launched during the current financial framework in order to ascertain whether and to what extent such risk-sharing financial instruments offer additional benefits in the area of infrastructure financing.

 

Amendment    5

Proposal for a regulation -- amending act

Recital 14 a (new)

 

Text proposed by the Commission

Amendment

 

(14a) Nonetheless, it should be borne in mind that project securities can only supplement existing financing models and cannot entirely replace them.

 

Amendment    6

Proposal for a regulation – amending act

Recital 15

 

Text proposed by the Commission

Amendment

(15) In order to implement the pilot phase of the Europe 2020 Project Bond Initiative, Decision No 1639/2006/EC and Regulation (EC) No 680/2007 should be amended. This pilot phase aims to support infrastructure projects with commercial potential in the transport, energy and ICT sectors, while after 2013 the initiative may be extended to other sectors.

(15) In order to implement the pilot phase of the Europe 2020 Project Bond Initiative, Decision No 1639/2006/EC and Regulation (EC) No 680/2007 should be amended. This pilot phase aims to support infrastructure projects with commercial potential in the transport, energy and ICT sectors.

 

 

Amendment    7

Proposal for a regulation – amending act

Recital 16

 

Text proposed by the Commission

Amendment

(16) In light of the EIB's long-standing expertise and as the major financier of infrastructure projects and given its nature as the EU financial body established by the Treaty, the Commission should involve the EIB in the implementation of this pilot phase. The specific terms and conditions of the co-operation including risk-sharing and remuneration of the EIB, should be laid down in an agreement between the Commission and the EIB.

(16) In light of the EIB's long-standing expertise and as the major financier of infrastructure projects and given its nature as the EU financial body established by the Treaty, the Commission should involve the EIB in the implementation of this pilot phase. The EIB should also be increasingly used for innovation projects. The specific terms and conditions of the co-operation including risk-sharing and remuneration of the EIB, should be laid down in an agreement between the Commission and the EIB and the rules on the introduction of the loan guarantee instrument laid down in Article 6(1)(d) and the annex to Regulation (EC) No 680/2007 of the European Parliament and of the Council of 20 June 2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks1. The Commission should inform the European Parliament and the Council of the wording of the agreement without delay.

 

____________

 

1 OJ L 162, 22.6.2007, p. 1.

 

 

Amendment    8

Proposal for a regulation – amending act

Recital 17

 

Text proposed by the Commission

Amendment

(17) The pilot phase of the Europe 2020 Project Bond Initiative should be launched in preparation of the proposed Connecting Europe Facility. This pilot phase will help to pave the way for the risk-sharing financial instrument under the Connecting Europe Facility.

(17) The pilot phase of the Europe 2020 Project Bond Initiative is without prejudice to the decision about the Union’s Multiannual Financial Framework (MFF) after 2013 and, in particular, the Commission proposal for the establishment of the Connecting Europe Facility (CEF). The pilot phase should therefore be launched to test whether this risk-sharing financial instrument can offer an added value to be implemented under the proposed Connecting Europe Facility. The decision about the continuation of the Europe 2020 Project Bond Initiative after the end of the pilot phase will only be taken after an independent evaluation of the pilot phase has taken place. The Commission should provide for an exit from the initiative if the predicted market uptake is not satisfactory or when sufficient alternative sources of long-term debt financing become available.

 

Amendment    9

Proposal for a regulation -- amending act

Recital 18

 

Text proposed by the Commission

Amendment

(18) The application for support, selection and implementation of all projects shall be subject to Union law, in particular with regard to state aid and shall seek to avoid creating or adding to market distortions.

(18) The application for support, selection and implementation of all projects should be made on equal conditions for all projects and be subject to Union law, in particular with regard to state aid and shall seek to avoid creating or adding to market distortions.

 

 

Amendment    10

Proposal for a regulation -- amending act

Recital 20

 

Text proposed by the Commission

Amendment

(20) Budgetary funds should be requested by the EIB on the basis of a range of projects, which the EIB would deem suitable and likely to be realised. Any such requests should be made prior to 31 December 2013. Due to the complexity of large infrastructure projects, the actual approval might take place at a later date, but no later than 31 December 2014.

(20) Budgetary funds should be requested by the EIB on the basis of a range of projects, which the EIB would deem suitable, in line with the Union's long term policy objectives and likely to be realised. Any such requests should be made prior to 31 December 2013. Due to the complexity of large infrastructure projects, the actual approval might take place at a later date, but no later than 31 December 2014.

 

Amendment    11

Proposal for a regulation – amending act

Article 1 - point 2 - point a

Decision No 1639/2006/EC

Article 31 - paragraph 2 - subparagraph 3

 

Text proposed by the Commission

Amendment

Alternatively, the Union may make a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds referred to in paragraphs 2a to 2d.

Alternatively, the Union may make a financial contribution to the EIB during the pilot phase in 2012 and 2013 to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds referred to in paragraphs 2a to 2d."

 

 

Amendment    12

Proposal for a regulation – amending act

Article 1 – paragraph 1 – point 2 – point (b)

Decision No 1639/2006/EC

Article 31 – paragraph 2a

 

Text proposed by the Commission

Amendment

2a. takes the form of a loan or a guarantee granted by the EIB in favour of financing provided to projects in the field of ICT and broadband;

2a. takes the form of a loan or a guarantee granted by the EIB in favour of financing provided to projects of common European interest in the field of ICT and broadband;

Justification

For subsidiarity reasons only projects of common interest should be covered.

 

 

Amendment    13

Proposal for a regulation – amending act

Article 1 - point 2 - point b

Decision No 1639/2006/EC

Article 31 - paragraph 2a - point c a (new)

 

Text proposed by the Commission

Amendment

(ca) is used to support investments which do not receive adequate financing from the market;

 

 

Amendment    14

Proposal for a regulation – amending act

Article 1 - point 2 - point b

Decision No 1639/2006/EC

Article 31 - paragraph 2a - point c b (new)

 

Text proposed by the Commission

Amendment

(cb) is complementary to financing by Member States or private investors;

 

Amendment    15

Proposal for a regulation – amending act

Article 1 - point 2 - point b

Decision No 1639/2006/EC

Article 31 - paragraph 2a - point c c (new)

 

Text proposed by the Commission

Amendment

(cc) does not distort competition in the internal market;

 

Amendment    16

Proposal for a regulation – amending act

Article 1 - point 2 - point b

Decision No 1639/2006/EC

Article 31 - paragraph 2a - point c d (new)

 

Text proposed by the Commission

Amendment

(cd) is used only for projects which generate added value for the Union, which means that projects should be implemented at European level only where this is justified by the scope and effects of the project's implementation, and the objectives of the project can be better achieved at Union level than at national level.

 

Amendment    17

Proposal for a regulation – amending act

Article 1 - point 2 - point b

Decision No 1639/2006/EC

Article 31 - paragraph 2b

 

Text proposed by the Commission

Amendment

2b. The Union exposure to the risk sharing instrument for project bonds, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB.

2b. The Union exposure to the risk sharing instrument for project bonds, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB. The precise definition of the rules shall be laid down in accordance with the rules on the introduction of the loan guarantee instrument laid down in Article 6(1)(d) and the annex of Regulation (EC) No 680/2007.

 

The Commission shall inform the European Parliament and the Council of the wording of the agreement referred to in the first subparagraph without delay.

 

Amendment    18

Proposal for a regulation – amending act

Article 1 - point 2 - point b

Decision No 1639/2006/EC

Article 31 - paragraph 2c

 

Text proposed by the Commission

Amendment

2c. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB.

2c. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB and disclosed to the European Parliament and the Council . Risk assessment by the EIB shall be guaranteed in accordance with the Banking Directives.

 

 

 

Amendment    19

Proposal for a regulation – amending act

Article 1 – point 2 – point b

Decision No 1639/2006/EC

Article 31 – paragraph 2d a (new)

Text proposed by the Commission

Amendment

 

2da (new) The Commission shall, in coordination with the EIB, submit annual reports to the European Parliament containing a breakdown by project of the utilisation of the amounts referred to in paragraph 2d. The report shall also contain information regarding the performance of the risk-sharing instrument for project bonds and recommendations regarding ways of enhancing its effectiveness. By the end of the pilot phase a consultation of directly involved stakeholders shall be undertaken.

Amendment    20

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 14 - introductory part

 

Text proposed by the Commission

Amendment

14. 'risk-sharing instrument for project bonds' means a credit enhancement provided to projects of common interest. The risk-sharing instrument for project bonds covers the debt service risk of a project and mitigates the credit-risk of bond holders. It is used only for projects whose financial viability is based on project revenues.

14. 'risk-sharing instrument for project bonds' means a credit enhancement provided to projects of common interest. The risk-sharing instrument for project bonds covers the debt service risk of a project and mitigates the credit-risk of bond holders. It is used only:

 

Amendment    21

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 14 - point a (new)

 

Text proposed by the Commission

Amendment

(a) for projects whose financial viability is based on project revenues;

 

Amendment    22

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 14 - point b (new)

 

Text proposed by the Commission

Amendment

(b) to support investments which do not receive adequate financing from the market;

 

 

 

Amendment    23

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 14 - point c (new)

 

Text proposed by the Commission

Amendment

(c) as a complementary tool to financing by Member States or private investors;

 

Amendment    24

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 14 - point d (new)

 

Text proposed by the Commission

Amendment

(d) without distorting competition in the internal market;

 

Amendment    25

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 14 - point e (new)

 

Text proposed by the Commission

Amendment

(e) for projects which generate added value for the Union, which means that projects should be implemented at European level only where this is justified by the scope and effects of the project's implementation and the objectives of the project can be better achieved at Union level than at national level;

 

Amendment    26

Proposal for a regulation – amending act

Article 2 - point 1

Regulation (EC) No 680/2007

Article 2 - point 15

 

Text proposed by the Commission

Amendment

15. 'Credit enhancement' means the use of an EIB loan or an EIB guarantee to improve the credit quality of the project debt.

deleted

 

Amendment    27

Proposal for a regulation – amending act

Article 2 - point 3 - point b

Regulation (EC) No 680/2007

Article 6 - paragraph 1 - point g

 

Text proposed by the Commission

Amendment

(g) a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds in the field of TEN-T and TEN-E. The Union exposure to the risk sharing instrument, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB. In 2012 and 2013, an amount of up to EUR 210 million, of which up to EUR 200 million for transport projects and up to EUR 10 million for energy projects, may be redeployed for the risk-sharing instrument for project bonds in accordance with the procedure referred to in Article 15(2) from the TEN-T (LGTT) and TEN-E budget lines, respectively. The risk-sharing instrument for project bonds may reuse any revenues received within the investment period for new loans and guarantees.

(g) a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds in the field of TEN-T and TEN-E. The Union exposure to the risk sharing instrument, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB and disclosed to the European Parliament and the Council. In 2012 and 2013, an amount of up to EUR 210 million, of which up to EUR 200 million for transport projects and up to EUR 10 million for energy projects, may be redeployed for the risk-sharing instrument for project bonds in accordance with the procedure referred to in Article 15(2) from the TEN-T (LGTT) and TEN-E budget lines, respectively.

 

The precise definition of the rules shall be laid down in accordance with the rules on the introduction of the loan guarantee instrument laid down in Article 6(1)(d) and the annex to Regulation (EC) No 680/2007. The Commission shall inform the European Parliament and the Council of the wording of these rules without delay.

 

The risk-sharing instrument for project bonds may reuse any revenues received within the investment period for new loans and guarantees.

 

Amendment    28

Proposal for a regulation – amending act

Article 2 a (new)

 

Text proposed by the Commission

Amendment

 

Article 2a

The Commission shall report to the European Parliament and the Council each year on the implementation reports submitted by the EIB, in accordance with point 49 of the Interinstitutional Agreement of 17 May 2006.

 

 

 

PROCEDURE

Title

Amendment of Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and of Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

References

COM(2011)0659 – C7-0372/2011 – 2011/0301(COD)

Committee responsible

       Date announced in plenary

BUDG

17.11.2011

 

 

 

Committee(s) asked for opinion(s)

       Date announced in plenary

ITRE

17.11.2011

 

 

 

Rapporteur(s)

       Date appointed

Werner Langen

14.12.2011

 

 

 

Discussed in committee

28.2.2012

 

 

 

Date adopted

21.3.2012

 

 

 

Result of final vote

+:

–:

0:

55

0

1

Members present for the final vote

Gabriele Albertini, Josefa Andrés Barea, Jean-Pierre Audy, Zigmantas Balčytis, Jan Březina, Reinhard Bütikofer, Maria Da Graça Carvalho, Giles Chichester, Jürgen Creutzmann, Christian Ehler, Vicky Ford, Gaston Franco, Adam Gierek, Norbert Glante, András Gyürk, Fiona Hall, Jacky Hénin, Romana Jordan, Krišjānis Kariņš, Lena Kolarska-Bobińska, Béla Kovács, Bogdan Kazimierz Marcinkiewicz, Marisa Matias, Judith A. Merkies, Angelika Niebler, Jaroslav Paška, Vittorio Prodi, Miloslav Ransdorf, Herbert Reul, Michèle Rivasi, Jens Rohde, Paul Rübig, Amalia Sartori, Salvador Sedó i Alabart, Francisco Sosa Wagner, Britta Thomsen, Patrizia Toia, Evžen Tošenovský, Ioannis A. Tsoukalas, Claude Turmes, Marita Ulvskog, Vladimir Urutchev, Kathleen Van Brempt, Alejo Vidal-Quadras, Henri Weber

Substitute(s) present for the final vote

António Fernando Correia de Campos, Jolanta Emilia Hibner, Yannick Jadot, Seán Kelly, Bernd Lange, Werner Langen, Alajos Mészáros, Mario Pirillo, Alyn Smith, Hannu Takkula, Silvia-Adriana Ţicău

 

 

28.3.2012

OPINION of the Committee on Transport and Tourism

for the Committee on Budgets

on the proposal for a regulation of the European Parliament and of the Council amending Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

( COM(2011)0659 – C7-0372/2011 - 2011/0301(COD) )

Rapporteur: Antonio Cancian

 

 

SHORT JUSTIFICATION

The European Union will never solve the problem of growth and employment using only the resources from the EU budget.

More than once the Commission has correctly stressed the key role that infrastructure will need to play in the re-launch of the European economy, with particular reference to the development of TEN-Ts, TEN-Es and telecommunication infrastructures. We are talking about investments in the order of 1500 billions Euro, a real Marshall Plan for Europe, in a competitive and liberalized European market.

The Monti Report recalls that "major public infrastructure in Europe, such as the TENs, is transnational, unfit for the currently fragmented national schemes, and their funding suffers from the absence of a liquid bond market for very long maturities, while long-term investors such as Pension funds cannot find a supply of bonds matching their investment needs."

The rapporteur welcomes the Project Bond Initiative EU2020 pilot phase. It recommends that this starts as soon as possible to meet the pressing investment needs in European infrastructures. It further invites the European Commission to consider the idea of allocating a higher amount of funding to the initiative, possibly utilising unspent funds under the current TEN-T programme.

The rapporteur is confident this initiative will have a very positive impact on the European economy, however it considers that the impact will unfortunately be limited to projects focussing on short- to medium- term returns.

A more important step should therefore be the launch of a new “European project bonds initiative” for infrastructures, involving the direct intervention of the European Union in the capital of infrastructure projects. The European Union would intervene directly in the equity of infrastructure projects, alone or alongside Member States, to improve the financial sustainability of infrastructure projects focussing on long term ROI (Return On Investment).

The resources available under the EU budget are insufficient for this endeavour. The Union would need to raise resources directly from the capital markets by issuing European project bonds. The proceeds from the bond issuance would then be used by the Union to purchase equity stakes in project companies or SPVs undertaking projects of European interest. The Union role would then not be limited to that of a co-financier, as it’s the case today with the allocation of grants from the EU budget or the loans/guarantees provided by the European Investment Bank. This would send a powerful signal to both public and private sector investors as well as financial markets. The participation of the EU as an investor would act as a guarantee of project realization, with important catalytic and leverage effects. This is a necessary step to build the infrastructures which are urgently needed by our continent today.

At the same time, the role of the Member States remains critical. The EU needs to ask the Member States to keep pushing forward a number of important reforms, such as streamlining of bureaucratic procedures for issuing permits and approvals within well-defined deadlines; providing incentives for special purpose companies, such as a partial/total de-taxation of the earnings for a certain period of time, in order to attract private capital, intervention on passive interest of the special purpose entity.

The construction of new modern and integrated infrastructures is fundamental if Europe is to remain a competitive, central player on the world stage and a leader in the post-crisis international economy. Building new infrastructures will create an enabling environment for a striving and competitive European private sector, stimulating growth, creating jobs and engaging future generations in the re-launch of our economy, thus addressing some of the most pressing challenges our continent is facing today.

AMENDMENTS

The Committee on Transport and Tourism calls on the Committee on Budgets, as the committee responsible, to incorporate the following amendments in its report:

Amendment    1

Proposal for a regulation

Recital 3

 

Text proposed by the Commission

Amendment

(3) Over the next decade, unprecedented investment volumes in Europe's transport, energy, information and communication networks will be needed in order to underpin the Europe 2020 flagship actions and develop smart, upgraded and fully interconnected infrastructures to foster the completion of the internal market. Estimated investment needs of the TEN-T network amount to EUR 500 billion. Among energy infrastructure projects of European relevance, approximately EUR 100 billion of investments is at risk of not being delivered due to obstacles related to permit granting, regulation and financing, while another EUR 100 billion will be financed by the sector itself. Investment needs for achieving the Digital Agenda objective of providing fast internet access for all European citizens and businesses range from EUR 181 to EUR 273 billion, of which private sector investment is expected to amount to between EUR 30 billion and EUR 100 billion.

(3) Over the next decade, unprecedented investment volumes in Europe's transport, energy, information and communication networks will be needed in order to underpin the Europe 2020 flagship actions and develop smart, upgraded and fully interconnected infrastructures to foster the completion of the internal market. Estimated investment needs of the TEN-T network amount to EUR 500 billion. Among energy infrastructure projects of European relevance, approximately EUR 100 billion of investments is at risk of not being delivered due to obstacles related to permit granting, regulation and financing, while another EUR 100 billion will be financed by the sector itself. Investment needs for achieving the Digital Agenda objective of providing fast internet access for all European citizens and businesses range from EUR 181 to EUR 273 billion, of which private sector investment is expected to amount to between EUR 30 billion and EUR 100 billion. It should be ensured, however, that EU-funded transport infrastructure takes into account energy-efficiency needs, noise reduction at source, biodiversity and climate-change challenges.

 

Amendment    2

Proposal for a regulation

Recital 4 a (new)

 

Text proposed by the Commission

Amendment

 

(4a) It is necessary to emphasise the importance of adopting the proposed MFF, as it introduces the Connecting Europe Facility (including the project bonds initiative) and allocates the appropriate budget.

 

Amendment    3

Proposal for a regulation

Recital 7

 

Text proposed by the Commission

Amendment

(7) The Europe 2020 Project Bond Initiative has a double objective: first to help finance projects of European policy priorities, and second, to facilitate greater private sector involvement in the long-term capital market financing of infrastructure projects. It will redirect some EU budget spending towards growth-enhancing areas, taking into account the Unions budgetary discipline and the ceilings under the current Multiannual Financial Framework.

(7) The Europe 2020 Project Bond Initiative has a double objective: first to help finance projects of European policy priorities, and second, to provide the requisite credit enhancement to attract capital market investors to the long-term capital market financing of infrastructure projects. It will redirect some EU budget spending towards growth-enhancing areas, taking into account the Unions budgetary discipline and the ceilings under the current Multiannual Financial Framework.

 

Amendment    4

Proposal for a regulation

Recital 9

 

Text proposed by the Commission

Amendment

(9) With the Europe 2020 Project Bond Initiative, bonds would be issued by project companies, the Union budget together with financing from a financial partner would be used to improve the credit quality of the bonds in order to attract debt capital market investors such as pension funds and insurance companies.

(9) With the Europe 2020 Project Bond Initiative, bonds would be issued by project companies, the Union budget together with financing from a financial partner would be used to improve the credit quality of the bonds in order to attract debt capital market investors such as pension funds, insurance companies and other interested parties.

 

Amendment    5

Proposal for a regulation

Recital 9 a (new)

 

Text proposed by the Commission

Amendment

 

(9a) A further step forward which should be carefully assessed and reported to the European Parliament and the Council is the public issuing of project bonds by the Union, targeted at financing sustainable infrastructure projects with European Added Value (i.e. TEN-T, TEN-E, etc.).In this case, the issuing of the project bond would have to follow a preliminary phase during which details of the project emerge, so as to enable close consideration of the risks and benefits of that project.

 

Amendment    6

Proposal for a regulation

Recital 14

 

Text proposed by the Commission

Amendment

(14) Therefore, a pilot phase for the Europe 2020 Project Bond Initiative should be launched during the current financial framework in order to develop debt capital market financing in the area of infrastructure more generally and to extend the range of financial instruments currently available for transport projects.

(14) Therefore, a pilot phase for the Europe 2020 Project Bond Initiative should be launched during the current financial framework in order to develop debt capital market financing in the area of infrastructure more generally and to extend the range of financial instruments currently available for transport projects, bearing in mind that the costs of transport should be reflected in its price in an undistorted way, as indicated in the White Paper on Transport Policy of 2011.

 

Amendment    7

Proposal for a regulation

Recital 14 a (new)

 

Text proposed by the Commission

Amendment

 

(14a) The details of the Europe 2020 Project Bond Initiative are not completely clear at the moment. The pilot phase should be implemented as soon as possible, in order to clarify outstanding issues raised by possible investors and external organisations involved.

 

Amendment    8

Proposal for a regulation

Recital 15

 

Text proposed by the Commission

Amendment

(15) In order to implement the pilot phase of the Europe 2020 Project Bond Initiative, Decision No 1639/2006/EC and Regulation (EC) No 680/2007 should be amended. This pilot phase aims to support infrastructure projects with commercial potential in the transport, energy and ICT sectors, while after 2013 the initiative may be extended to other sectors.

(15) In order to implement the pilot phase of the Europe 2020 Project Bond Initiative, Decision No 1639/2006/EC and Regulation (EC) No 680/2007 should be amended. This pilot phase aims to support infrastructure projects with a clear European added value and with commercial potential in the transport, energy and ICT sectors, while after 2013 the initiative may be extended to other sectors.

 

Amendment    9

Proposal for a regulation

Recital 17

 

Text proposed by the Commission

Amendment

(17) The pilot phase of the Europe 2020 Project Bond Initiative should be launched in preparation of the proposed Connecting Europe Facility. This pilot phase will help to pave the way for the risk-sharing financial instrument under the Connecting Europe Facility.

(17) The pilot phase of the Europe 2020 Project Bond Initiative should be launched no later than 31 July 2012, in preparation of the proposed Connecting Europe Facility. This pilot phase will pave the way for the full roll-out of the risk-sharing financial instrument under the Connecting Europe Facility.

 

Amendment    10

Proposal for a regulation

Recital 20

 

Text proposed by the Commission

Amendment

(20) Budgetary funds should be requested by the EIB on the basis of a range of projects, which the EIB would deem suitable and likely to be realised. Any such requests should be made prior to 31 December 2013. Due to the complexity of large infrastructure projects, the actual approval might take place at a later date, but no later than 31 December 2014.

(20) Budgetary funds should be requested by the EIB on the basis of a range of projects, which the EIB would deem suitable and likely to be realised. Any such requests should be made prior to 31 December 2013. Due to the complexity of large infrastructure projects, the actual approval might take place at a later date, but no later than 30 June 2014.

 

Amendment    11

Proposal for a regulation

Recital 20 a (new)

 

Text proposed by the Commission

Amendment

 

(20a) Since in the conclusions of the European Council of 1-2 March 2012, a deadline of June 2012 was set for reaching an agreement on the pilot phase of the Europe 2020 Project Bond Initiative, the Commission needs to start implementing this pilot phase without further delay.

 

Amendment    12

Proposal for a regulation

Article 1 – point 2 – point b – introductory part

 

Text proposed by the Commission

Amendment

(b) The following paragraphs 2a to 2d are inserted:

(b) The following paragraphs 2a to 2da are inserted:

 

Amendment    13

Proposal for a regulation

Article 1 – point 2 – point b

Decision No 1639/2006/EC

Article 31 – paragraph 2 d (new)

 

Text proposed by the Commission

Amendment

 

2da. The Commission shall submit annually to the European Parliament a report containing a breakdown by project of the utilisation of the amounts referred to in paragraph 2d. The report shall also contain information regarding the performance of the risk‑sharing instrument for project bonds and recommendations regarding ways of enhancing its effectiveness.

 

Amendment    14

Proposal for a regulation

Article 2 – point 3 – point b – introductory part

Regulation (EC) No 680/2007

Article 6– paragraph 1 – point b

 

Text proposed by the Commission

Amendment

(b) the following point (g) is added:

(b) the following point (g) – (ga) is added:

 

Amendment    15

Proposal for a regulation

Article 2 – point 3 – point b

Regulation (EC) No 680/2007

Article 6– paragraph 1 – point g a

 

Text proposed by the Commission

Amendment

 

(ga) The Commission shall submit annually to the European Parliament a report containing a breakdown by project of the utilisation of the amounts referred to in point (g) of paragraph 1. The report shall also contain information regarding the performance of the risk‑sharing instrument for project bonds and recommendations regarding ways of enhancing its effectiveness.

 

Amendment    16

Proposal for a regulation

Article 2 – point 3 – point b

Regulation (EC) No 680/2007

Article 6– paragraph 1 – point g

 

Text proposed by the Commission

Amendment

(g) a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds in the field of TEN-T and TEN-E. The Union exposure to the risk sharing instrument, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB. In 2012 and 2013, an amount of up to EUR 210 million, of which up to EUR 200 million for transport projects and up to EUR 10 million for energy projects, may be redeployed for the risk-sharing instrument for project bonds in accordance with the procedure referred to in Article 15(2) from the TEN-T (LGTT) and TEN-E budget lines, respectively. The risk-sharing instrument for project bonds may reuse any revenues received within the investment period for new loans and guarantees.

(g) a financial contribution to the EIB to the provisioning and capital allocation for loans or guarantees to be issued by the EIB on its own resources under the risk-sharing instrument for project bonds in the field of TEN-T and TEN-E. The Union exposure to the risk sharing instrument for project bonds, including management fees and other eligible costs, shall be strictly limited to the amount of the Union contribution to the risk-sharing instrument for project bonds and there shall be no further liability on the general budget of the Union. The residual risk inherent in all operations shall be borne by the EIB. The detailed terms and conditions for implementing the risk-sharing instrument for project bonds, including its monitoring and control, shall be laid down in a delegation agreement between the Commission and the EIB, which shall be submitted to the European Parliament and published in the Official Journal of the European Union. In 2012 and 2013, an amount of up to EUR 210 million, of which up to EUR 200 million for transport projects and up to EUR 10 million for energy projects, may be redeployed for the risk-sharing instrument for project bonds in accordance with the procedure referred to in Article 15(2) from the TEN-T (LGTT) and TEN-E budget lines, respectively. The risk-sharing instrument for project bonds may reuse any revenues received within the investment period for new loans and guarantees.

 

Amendment    17

Proposal for a regulation

Article 2 – point 3 a (new)

Regulation (EC) No 680/2007

Article 17 – paragraph 1 – subparagraph 1 a (new)

 

Text proposed by the Commission

Amendment

 

(3a) In Article 17(1), the following subparagraph is added:

 

Before 30 June 2013, the Commission shall submit to the European Parliament and the Council a report containing a list of the projects selected for the financial aid referred to in Article 6(1)(g), specifying the contribution, the financing institutions and the investors involved. The Commission shall include in that report a good practice guide and a list of investors potentially interested in innovative financial instruments. 

Justification

Precise information from the pilot Project Bonds phase is needed to identify the changes that might be made to the Connecting Europe Facility. The Commission should inform Parliament which investors are involved and how the selected projects can be improved.

 

Amendment    18

Proposal for a regulation

Article 2 – point 3 b (new)

Regulation (EC) No 680/2007

Article 19 – paragraph 1 a (new)

 

Text proposed by the Commission

Amendment

 

(3b) In Article 19 the following paragraph is inserted:

 

Before the end of 2013, the Commission shall submit to the European Parliament and the Council an assessment of the various financial instruments under this Regulation and of whether they need to be retained or amalgamated.

Justification

The Commission should inform Parliament, based on the experience acquired under the current financial framework and market acceptance, as to whether the legislative framework needs to be simplified or whether the current range of instruments should be retained.

 

 

 

PROCEDURE

Title

Amendment of Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and of Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

References

COM(2011)0659 – C7-0372/2011 – 2011/0301(COD)

Committee responsible

       Date announced in plenary

BUDG

17.11.2011

 

 

 

Committee(s) asked for opinion(s)

       Date announced in plenary

TRAN

17.11.2011

 

 

 

Rapporteur(s)

       Date appointed

Antonio Cancian

21.11.2011

 

 

 

Discussed in committee

28.2.2012

26.3.2012

 

 

Date adopted

27.3.2012

 

 

 

Result of final vote

+:

–:

0:

35

3

3

Members present for the final vote

Magdi Cristiano Allam, Georges Bach, Izaskun Bilbao Barandica, Philip Bradbourn, Antonio Cancian, Michael Cramer, Philippe De Backer, Luis de Grandes Pascual, Christine De Veyrac, Saïd El Khadraoui, Ismail Ertug, Carlo Fidanza, Knut Fleckenstein, Jacqueline Foster, Mathieu Grosch, Jim Higgins, Dieter-Lebrecht Koch, Georgios Koumoutsakos, Werner Kuhn, Jörg Leichtfried, Eva Lichtenberger, Marian-Jean Marinescu, Gesine Meissner, Hubert Pirker, Petri Sarvamaa, David-Maria Sassoli, Vilja Savisaar-Toomast, Olga Sehnalová, Debora Serracchiani, Brian Simpson, Silvia-Adriana Ţicău, Giommaria Uggias, Thomas Ulmer, Peter van Dalen, Artur Zasada, Roberts Zīle

Substitute(s) present for the final vote

Spyros Danellis, Karl-Heinz Florenz, Eider Gardiazábal Rubial, Alfreds Rubiks, Janusz Władysław Zemke

 

 

 

 

PROCEDURE

Title

Amendment of Decision No 1639/2006/EC establishing a Competitiveness and Innovation Framework Programme (2007-2013) and of Regulation (EC) No 680/2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks

References

COM(2011)0659 – C7-0372/2011 – 2011/0301(COD)

Date submitted to Parliament

19.10.2011

 

 

 

Committee responsible

       Date announced in plenary

BUDG

17.11.2011

 

 

 

Committee(s) asked for opinion(s)

       Date announced in plenary

ITRE

17.11.2011

TRAN

17.11.2011

 

 

Rapporteur(s)

       Date appointed

Göran Färm

25.1.2012

 

 

 

Date adopted

25.4.2012

 

 

 

Result of final vote

+:

–:

0:

31

1

2

Members present for the final vote

Reimer Böge, Zuzana Brzobohatá, Jean-Luc Dehaene, Isabelle Durant, Göran Färm, José Manuel Fernandes, Eider Gardiazábal Rubial, Salvador Garriga Polledo, Jens Geier, Ivars Godmanis, Estelle Grelier, Carl Haglund, Lucas Hartong, Jutta Haug, Monika Hohlmeier, Sidonia Elżbieta Jędrzejewska, Ivailo Kalfin, Sergej Kozlík, Jan Kozłowski, Giovanni La Via, George Lyon, Barbara Matera, Juan Andrés Naranjo Escobar, Dominique Riquet, Potito Salatto, Helga Trüpel, Derek Vaughan

Substitute(s) present for the final vote

Alexander Alvaro, Maria Da Graça Carvalho, Derk Jan Eppink, María Muñiz De Urquiza, Georgios Papastamkos, Paul Rübig, Peter Šťastný

Date tabled

2.5.2012

 

 

[1] OJ C 0, 0.0.0000, p. 0.
[2] OJ C 0, 0.0.0000, p. 0.
[3] P7_TA(2011)0266
[4] P7_TA(2011)0068
[5] P7_TA(2012)0023
[6] P7_TA(2012)0048
[7] I.e. re-paid after senior debt and before equity
[8] Creation of a special purpose vehicle (SPV), for issuing the bonds, contracting other forms of debt, benefiting from the EU/EIB guarantee and receiving equity
[9] EIB Papers Volume 13/1 (2008)