Plenary sitting

 

A7-0021/2014

13.1.2014

***I

REPORT

on the proposal for a regulation of the European Parliament and of the Council laying down general provisions on the Asylum and Migration Fund and on the instrument for financial support for police cooperation, preventing and combating crime, and crisis management

( COM(2011)0752 – C7‑0444/2011 – 2011/0367(COD) )

Committee on Civil Liberties, Justice and Home Affairs

Rapporteur: Lorenzo Fontana

PR_COD_1consamCom

 

 

Symbols for procedures

  *  Consultation procedure

  ***  Consent procedure

  ***I  Ordinary legislative procedure (first reading)

  ***II  Ordinary legislative procedure (second reading)

  ***III  Ordinary legislative procedure (third reading)

 

(The type of procedure depends on the legal basis proposed by the draft act.)

 

 

 

 

 

Amendments to a draft act

Amendments by Parliament set out in two columns

 

Deletions are indicated in bold italics in the left-hand column. Replacements are indicated in bold italics in both columns. New text is indicated in bold italics in the right-hand column.

 

The first and second lines of the header of each amendment identify the relevant part of the draft act under consideration. If an amendment pertains to an existing act that the draft act is seeking to amend, the amendment heading includes a third line identifying the existing act and a fourth line identifying the provision in that act that Parliament wishes to amend.

 

Amendments by Parliament in the form of a consolidated text

 

New text is highlighted in bold italics. Deletions are indicated using either the ▌symbol or strikeout. Replacements are indicated by highlighting the new text in bold italics and by deleting or striking out the text that has been replaced.

By way of exception, purely technical changes made by the drafting departments in preparing the final text are not highlighted.

 

 

 

CONTENTS

Page

DRAFT EUROPEAN PARLIAMENT LEGISLATIVE RESOLUTION  5

ANNEX TO THE DRAFT LEGISLATIVE RESOLUTION  57

OPINION of the Committee on Budgets  59

PROCEDURE  80

 

 

DRAFT EUROPEAN PARLIAMENT LEGISLATIVE RESOLUTION

on the proposal for a regulation of the European Parliament and of the Council laying down general provisions on the Asylum and Migration Fund and on the instrument for financial support for police cooperation, preventing and combating crime, and crisis management

( COM(2011)0752 – C7‑0444/2011 – 2011/0367(COD) )

(Ordinary legislative procedure: first reading)

The European Parliament,

–  having regard to the Commission proposal to Parliament and the Council ( COM(2011)0752 ),

–  having regard to Article 294(2) and Articles 78(2), 79(2) and (4), 82(1), 84 and 87(2) of the Treaty on the Functioning of the European Union, pursuant to which the Commission submitted the proposal to Parliament (C7‑0444/2011),

–  having regard to Article 294(3) of the Treaty on the Functioning of the European Union,

–  having regard to the opinion of the European Economic and Social Committee of 11 July 2012[1],

–  having regard to the opinion of the Committee of the Regions of 18 July 2012[2],

–  having regard to the undertaking given by the Council representative by letter of 20 December 2013 to approve Parliament’s position, in accordance with Article 294(4) of the Treaty on the Functioning of the European Union,

–  having regard to Rule 55 of its Rules of Procedure,

–  having regard to the report of the Committee on Civil Liberties, Justice and Home Affairs and the opinion of the Committee on Budgets ( A7-0021/2014 ),

1.  Adopts its position at first reading hereinafter set out;

2.  Takes note of the Commission statements annexed to this resolution;

3.  Calls on the Commission to refer the matter to Parliament again if it intends to amend its proposal substantially or replace it with another text;

4.  Instructs its President to forward its position to the Council, the Commission and the national parliaments.

Amendment    1

AMENDMENTS BY THE EUROPEAN PARLIAMENT[3]*

to the Commission proposal

---------------------------------------------------------

REGULATION (EU) NO …/2013

OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

of

laying down general provisions on the Asylum and Migration fund and on the instrument for financial support for police cooperation, preventing and combating crime, and crisis management

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

 

Having regard to the Treaty on the Functioning of the European Union, and in particular Articles 78(2), 79(2), 79(4), 82(1), 84 and 87(2) thereof,

 

Having regard to the proposal from the European Commission,

 

After transmission of the draft legislative act to the national Parliaments,

 

Having regard to the opinion of the European Economic and Social Committee[4],

 

Having regard to the opinion of the Committee of the Regions[5],

 

Acting in accordance with the ordinary legislative procedure,

 

Whereas:

 

(1)  The European Union's home affairs policy is to create an area of freedom, security and justice: an area without internal borders where people may enter, move, live and work freely, confident that their rights are fully respected and their security assured, bearing in mind common challenges such as the development of a comprehensive Union immigration policy to enhance competitiveness and social cohesion of the Union, the creation of a common European Asylum System▌, the prevention ▌of threats of serious and organised crime, and the fight against illegal immigration, human trafficking, cybercrime and terrorism.

 

(1a)  It is necessary to adopt an integrated approach to questions arising from the pressure of migration and asylum applications and regarding the management of EU external borders, ensuring full respect for international and human rights law, including for actions implemented in third countries, showing solidarity amongst all Member States and demonstrating an awareness of the need to respect national responsibilities, while ensuring a clear definition of tasks.

(2)  Union funding to support the development of this area should bring added value for the Union and constitute a tangible sign of the solidarity and responsibility sharing that are indispensable in responding to the common challenges.

 

(3)  The existence of a common framework should ensure the necessary coherence, simplification and uniform implementation of that funding across the policy areas concerned.

 

(3a)  Spending of funds in this area should be coordinated in order to assure complementarity, efficiency and visibility, as well as to achieve budgetary synergies.

 

(4)  A common framework should lay down the principles of assistance and identify the responsibilities of the Member States and the Commission in ensuring the application of those principles including the prevention and detection of irregularities and fraud.

 

(5)  This Union funding would be more efficient and better targeted if co-financing of eligible actions were based on strategic multiannual programming, drawn up by each Member State in dialogue with the Commission.

 

(6)  Measures on and in relation to third countries supported through the Fund should be taken in synergy and coherence with other actions outside the Union supported through Union external assistance instruments, both geographic and thematic. In particular, in implementing such actions full coherence should be sought with the principles and general objectives of the Union external action and foreign policy related to the country or region in question. They should not be intended to support actions that are directly oriented towards development▌ and they should complement, when appropriate, the financial assistance provided through external aid instruments. The principle of policy coherence for development, as set out in Paragraph 35 of the European consensus on Development, should be respected. It is also important to ensure that the implementation of emergency assistance▌ is consistent with, and, where relevant, complementary to the Union humanitarian policy and respects humanitarian principles as set out in the European Consensus on Humanitarian Aid.

 

(7)  External action should be consistent and coherent as set out in article 18(4) of TEU.

 

(8)  Prior to the preparation of multi-annual programmes as a means to achieve the objectives of this Union funding, Member States and the Commission should engage in a policy dialogue and thereby establishing a coherent strategy for each individual Member State. Following the completion of the policy dialogue, each Member State should submit to the Commission a national programme describing how it aims at achieving the objectives of the relevant specific regulation for the 2014-2020 period. The Commission should examine whether the national programme is consistent with those objectives and with the outcome of the policy dialogue. Moreover, the Commission should examine whether the distribution of Union funding between the objectives complies with the minimum percentage set per objective in the relevant specific regulation. It should be possible for Member States to depart from those minimum percentages, in which case they should state the reasons for the deviation in their national programme. In the event that the reasons given by the Member State were not deemed adequate, the Commission might not approve the national programme. The Commission should regularly inform the European Parliament of the outcome of the policy dialogues, of the full programming process including the preparation of national programmes, including compliance with the minimum percentage set per objective in the relevant specific regulations, and of the implementation of the national programmes.

 

(9)  The strategy should be subject to a mid term review, to ensure appropriate funding in period 2018-2020.

 

(10)  Member States should establish, in a manner consistent with the principle of proportionality and the need to minimise the administrative burden, a partnership with the authorities and bodies concerned to develop and implement ▌their national programmes throughout the entire multiannual period. Member States will ensure that there will be no conflict of interest among the partners at the different stages of the programming cycle. Each Member State should set up a committee to monitor the national programme and assist it in reviewing the implementation and the progress made in achieving the programme objectives. Each Member State should be responsible for establishing the practical modalities for setting up the monitoring committee.

 

(11)  Eligibility of expenditure under the national programmes should be determined by national law, subject to common principles set out in this regulation. The starting and closing dates for the eligibility of expenditure should be defined so as to provide for uniform and equitable rules applying to the national programmes.

 

(12)  Technical assistance should enable the Member States to support the implementation of their national programmes and assist beneficiaries in complying with their obligations and Union law. Where appropriate, technical assistance could cover the costs incurred by the competent authorities in third countries.

 

(13)  To ensure an adequate framework for providing rapidly emergency assistance, this Regulation should allow support for actions the expenditure of which was incurred before the application for such assistance was made, but not before 1 January 2014, in accordance with the provision in the Financial Regulation[6] which allows such flexibility in duly substantiated exceptional cases. The support may constitute 100% of the eligible expenditure in duly justified cases where this is essential for the action to be carried out particularly where the beneficiary is an international or non governmental organisation. Actions supported with emergency assistance should arise directly from the emergency situation and should not replace long-term investments by Member States.

 

(13а)  The decisions taken relevant to the contribution from the Union budget should be properly documented to maintain an adequate audit trail.

 

(14)  The financial interests of the▌ Union should be protected through proportionate measures throughout the expenditure cycle, including the prevention, detection and investigation of irregularities, the recovery of funds lost, wrongly paid or incorrectly used and, where appropriate, administrative and financial penalties in accordance with the Financial Regulation.

 

(14a)  In the context of the protection of the financial interests of the European Union, the on-the-spot checks and audits carried out by the Member States, Commission, Court of Auditors and OLAF can be announced as well as unannounced to the economic operators, in accordance with the applicable law.

 

(14b)  The new structure of the MFF home related Funds aims to simplify the applicable rules and to reduce the administrative burden for the beneficiaries. Nevertheless, the control mechanism should remain efficient, and therefore it is important to recall the applicable rules on the protection of the financial interests of the EU, providing for on the spot checks and audits which may be announced as well as unannounced.

 

(15)  Member States should adopt adequate measures to guarantee the proper functioning of the management and control system and the quality of implementation. To this end, it is necessary to establish the general principles and necessary functions which these systems should fulfil.

 

(16)  The obligations on the Member States as regards management and control systems, the prevention, detection and correction of irregularities and infringements of Union law should be specified in order to guarantee the efficient and correct implementation of their national programmes.

 

(17)  In accordance with the principles of subsidiarity and proportionality, Member States should have the primary responsibility, through their management and control systems, for the implementation and control of national programmes. The support provided under the Specific Regulations shall be implemented in close cooperation between the Commission and the Member States in accordance with the principle of subsidiarity.

 

(17a)  Member States should make full use of the knowledge, expertise and experience, gained by public and/or private bodies in implementing earlier funds in the field of Home Affairs.

 

(18)  Only Responsible Authorities designated by the Member States offer reasonable assurance that the necessary controls have been carried out before granting support from the Union budget to beneficiaries. It should therefore be explicitly laid down that only expenditure effected by designated responsible authorities can be reimbursed from the Union budget.

(19)  The powers and responsibilities of the Commission to verify the effective functioning of the management and control systems, and to require Member State action, should be laid down.

 

(20)  Union budget commitments should be effected annually. In order to ensure effective programme management, it is necessary to lay down common rules for the payment of the annual balance, and the final balance.

 

(21)  The pre-financing payment at the start of programmes ensures that the Member State has the means to provide support to beneficiaries in the implementation of the programme once the programme is approved. Therefore, provisions should be made for initial pre-financing amounts. Initial pre-financing should be totally cleared at closure of the programme. The Responsible Authorities should ensure that beneficiaries receive promptly the full amount due.

 

(21a)  In addition annual pre-financing should be provided to ensure that MS have sufficient means to implement their national programmes. Annual pre-financing should be cleared each year with the payment of the annual balance.

 

(22)  The triennial revision of the Financial Regulation[7] introduces changes in the shared management method which have to be taken into account.

 

(23)  With a view to strengthening accountability for expenditure co-financed by the Union budget in any given year, an appropriate framework should be created for the annual clearance of accounts. Under this framework, the Responsible Authority should submit to the Commission, in respect of a national programme the documents as set out in Article 59 of Regulation 966/2012 [new Financial Regulation].

 

(24)  To support the assurance underlying the annual clearance of accounts across the Union, common provisions should be laid down on the nature and level of the controls to be carried out by Member States.

 

(25)  In order to ensure the sound financial management of Union resources, it may be necessary for the Commission to make financial corrections. To ensure legal certainty for the Member States, it is important to define the circumstances under which breaches of applicable Union or national law can lead to financial corrections by the Commission. In order to ensure that financial corrections which the Commission may impose on Member States are related to the protection of the Union's financial interests, they should be confined to cases where the breach of Union or national law concerns directly or indirectly the eligibility, regularity, management or control of actions and the corresponding expenditure. To ensure proportionality it is important that the Commission considers the nature and the gravity of the breach in deciding the amount of financial correction. In this regard, it is appropriate to set out the criteria for applying financial corrections by the Commission and the procedure that may lead to a decision on the financial correction.

 

(26)  In order to establish the financial relationship between the Responsible Authorities and the Union budget, the Commission should clear the accounts of these authorities annually. The clearance of accounts decision should cover the completeness, the accuracy and veracity of the accounts but not the conformity of the expenditure with the Union legislation.

 

(27)  The Commission, which is responsible for the proper application of Union law under Article 17 of the Treaty on European Union, should decide whether the expenditure incurred by the Member States complies with Union legislation. Member States should be given the right to justify their decisions to make payments. In order to give Member States legal and financial assurances as to expenditure effected in the past, a maximum period should be set for the Commission to decide which financial consequences should follow from non-compliance.

 

(27a)  It is important to ensure sound financial management and effective implementation, while also ensuring transparency, legal certainty, accessibility of funding and equal treatment of beneficiaries.

 

(27b)  With a view to simplifying the use of funding and reducing the risk of error, while providing for differentiation where needed to reflect the specificities of policy, it is appropriate to define the forms of support, harmonised conditions for the eligibility of expenditure grants, including simplified costs options. In accordance with the principles of subsidiarity, Member States should adopt national rules on the eligibility of expenditure.

 

(28)  In order to encourage financial discipline, it is appropriate to define the arrangements for decommitment of any part of the budget commitment in a national programme, in particular where an amount may be excluded from the decommitment, notably when delays in the implementation result from a legal proceeding or an administrative appeal having suspending effect or from reasons of force majeur.

 

(29)  To ensure the appropriate application of the general rules on decommitment, the rules established should detail how the deadlines for decommitment are established and how the respective amounts are calculated.

 

(30)  It is important to bring the achievements of Union funding to the attention of the general public. Citizens have a right to know how the Union's financial resources are spent. The responsibility to ensure that the appropriate information is communicated to the public should lie with the Commission, the Responsible Authorities and the beneficiaries. To ensure more efficiency in communication to the public at large and stronger synergies between the communication activities undertaken at the initiative of the Commission, the budget allocated to communication actions under this Union funding shall also contribute to cover corporate communication of the political priorities of the European Union provided that these are related to the general objectives of this Union funding.

 

(31)  For the purpose of ensuring a wide dissemination of information about this Union funding and to inform potential beneficiaries about funding opportunities, detailed rules relating to information and communication measures, as well as certain technical characteristics of such measures should be defined on the basis of this Regulation and each Member State should, at least, establish a website or website portal with the necessary information. Member States should undertake more direct forms of communication campaigns in order to properly inform the potential beneficiaries by, inter alia, organising regular public events, so-called information days and training sessions.

 

(32)  The effectiveness of actions supported also depend on their evaluation and the dissemination of their results. The responsibilities of the Member States and the Commission in this regard, and arrangements to ensure the reliability of evaluation and the quality of the related information, should be formalised.

 

(32a)  In the application of the Regulation, including the preparation of delegated acts, the Commission should consult experts from all Member States.

 

(33)  In order to amend provisions of this Regulation on the common principles on the eligibility of expenditure, the power to adopt acts in accordance with Article 290 of the Treaty on the Functioning of the European Union should be delegated to the Commission. It is of particular importance that the Commission carry out appropriate consultations during its preparatory work, including at expert level. The Commission, when preparing and drawing up delegated acts, should ensure a simultaneous, timely and appropriate transmission of relevant documents to the European Parliament and to the Council.

 

(34)  In order to ensure uniform conditions for the implementation of this Regulation, it should confer implementing powers on the Commission. Those powers should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council of 16 February 2011 laying down the rules and general principles concerning mechanisms for control by Member States of the Commission's exercise of implementing powers[8].

 

(35)  The examination procedure should be be used for implementing acts that lay down common obligations on Member States, in particular on the provision of information to the Commission, and the advisory procedure should be used for the adoption of implementing acts relating to the model forms for the provision of information to the Commission, given their purely technical nature.

 

(36)  Since the objective of this Regulation, namely to lay down general provisions cannot be sufficiently achieved by the Member States and can be better achieved at Union level, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty on European Union. In accordance with the principle of proportionality, as set out in that Article, this Regulation does not go beyond what is necessary in order to achieve that objective.▌

 

(36a)  Insofar as this Regulation lays down general rules necessary for enabling the implementation of Specific Regulations which provide for its applicability to these Specific Regulations and which constitute acts building upon the Schengen acquis in relation to countries to which these Specific Regulations are applicable on the basis of relevant Protocols annexed to the Treaty on European Union and to the Treaty on the Functioning of the European Union or on the basis of the relevant Agreements, this Regulation should be applied together with these Specific Regulations. To that extent, this implies that this Regulation can establish a link with and can have a direct impact on the provisions of the Specific Regulations developing the Schengen acquis, thus affecting the latter's legal framework.

 

(36b)  In accordance with Article 3 of the Protocol 21on the position of the United Kingdom and Ireland in respect of the area of Freedom, security and Justice, annexed to the Treaty on European Union and to the Treaty on the functioning of the European Union, the United Kingdom has notified its wish to take part in the adoption and application of this Regulation.

 

(36c)  In accordance with Article 3 of the Protocol 21 on the position of the United Kingdom and Ireland in respect of the area of Freedom, security and Justice, annexed to the Treaty on European Union and to the Treaty on the functioning of the European Union, Ireland has notified its wish to take part in the adoption and application of this Regulation.

 

(37)  In accordance with Articles 1 and 2 of the Protocol of the position of Denmark annexed to the Treaty on European Union and to the Treaty on the Functioning of the European Union, Denmark is not taking part in the adoption of this Regulation and is not bound by it or subject to its application;

 

(38)  It is appropriate to align the duration of this Regulation with the Council Regulation laying down the multiannual financial framework for the years 2014-2020* [*OJ …]. Therefore, this Regulation should apply as from 1 January 2014.

 

HAVE ADOPTED THIS REGULATION:

 

CHAPTER I

GENERAL PROVISIONS

 

Article 1

Purpose and scope

This Regulation sets outs general rules for the implementation of the Specific Regulations with regard to:

 

(a)  the financing of expenditure;

(b)  partnership, programming, reporting, monitoring and evaluation;

 

(c)  the management and control systems to be put in place by the Member States;

 

(d)  the clearance of accounts.

 

Article 2

Definitions

 

For the purposes of this Regulation the following definitions shall apply:

 

(a)  "Specific Regulations" means

–  Regulation ../2012/EU [establishing the Asylum and Migration Fund for the period 2014-2020];

–  Regulation …/2012/EU [establishing, as part of the Internal Security Fund, the instrument for financial support for police cooperation, preventing and combating crime, and crisis management; and

–  Any other Regulation which provides for the application of this Regulation.

 

(b)  "programming" means the process of organisation, decision making and financing in several stages intended to implement, on a multiannual basis, the joint action by the Union and the Member States to achieve the objectives of the Specific Regulations;

 

(c)  "action" means a project or group of projects selected by the Responsible Authority of the national programme concerned, or under its responsibility, contributing to the general and specific objectives pursued by the Specific Regulations;

 

(d)  "Union action" means a transnational action or action of particular interest to the Union as defined in the Specific Regulations;

 

(e)  "project" means the specific, practical means deployed to implement all or a part of an action by a beneficiary of the Union contribution;

 

(f)  "emergency assistance" means a project or group of projects addressing an emergency situation as defined in the Specific Regulations;

 

(g)  "beneficiary" means the recipient of an Union contribution under a project, whether a public or private body, international organisations or the Red Cross (ICRC), the International Federation of National Red Cross and Red Crescent Societies.

 

CHAPTER II

PRINCIPLES OF ASSISTANCE

 

Article 3

General principles

1.  The Specific Regulations shall provide support, through national programmes, Union actions and emergency assistance, which complements national, regional and local intervention, pursuing the objectives of the Union and bringing an added value for the Union.

 

2.  The Commission and the Member States shall ensure that the support provided under the Specific Regulations and by the Member States is consistent with the relevant activities, policies and priorities of the European Union and complementary to other instruments of the European Union, while taking into account the specific context of each Member State.

 

3.  The support provided under the Specific Regulations shall be implemented in close cooperation between the Commission and the Member States.

 

4.  In accordance with their respective responsibilities, the Commission and the Member States, together with the EEAS as regards actions in and in relation to third countries, shall ensure coordination among this Regulation and the Specific Regulations, and with other relevant Union policies, strategies and instruments, including those in the framework of the Union's external action.

 

4a.  The Commission and the Members States, together with the European External Action Service where appropriate, shall ensure actions in and in relation to third countries are taken in synergy and coherence with other actions outside the Union supported through Union instruments. They shall, in particular, ensure that those actions:

(a)  are coherent with the Union's external policy, respect the principle of policy coherence for development, and are consistent with the strategic programming documents for the region or country in question;

(b)  focus on non-development-oriented measures;

(c)  serve the interests of the Union’s internal policies and are consistent with activities undertaken inside the Union.

 

5.  The Commission and the Member States shall apply the principle of sound financial management in accordance with Article [30] of the Financial Regulation, namely in accordance with the principles of economy, efficiency and effectiveness.

 

6.   The Commission and the Member States shall ensure the effectiveness of the support provided under the Specific Regulations, including through monitoring, reporting and evaluation.

 

7.  The Commission and the Member States shall carry out their respective roles in relation to this Regulation and the Specific Regulations with the aim of reducing the administrative burden for beneficiaries, the Member States and the Commission, taking into account the principle of proportionality.

 

Article 4

Compliance with Union and national law

Actions financed by the Specific Regulations shall comply with applicable Union and national law.

 

Article 5

Protection of the financial interests of the European Union

 

1.  The Commission shall take appropriate measures ensuring that, when actions financed under this Regulation and the Specific Regulations are implemented, the financial interests of the European Union are protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective checks and, if irregularities are detected, by the recovery of the amounts wrongly paid and, where appropriate, by effective, proportionate and dissuasive administrative and financial penalties.

 

2.  Member States shall prevent, detect and correct irregularities and shall recover amounts unduly paid together with any interest on late payments. They shall notify these to the Commission and shall keep it informed of significant progress in related administrative and legal proceedings.

 

3.  When amounts unduly paid to a beneficiary cannot be recovered and this is as a result of fault or negligence on the part of a Member State, the Member State shall be responsible for reimbursing the amounts concerned to the ▌budget of the Union.

 

4.  Member States shall offer effective prevention against fraud, especially as regards the areas with a higher level of risk, and which shall act as a deterrent, having regard to the benefits as well as the proportionality of the measures.

 

5.  The Commission shall be empowered to adopt delegated acts in accordance with the procedure referred to in Article 54, concerning the obligations of Member States specified in the paragraphs 2 and 3. The Commission shall adopt implementing acts in accordance with the advisory procedure under Article 55(2) setting out the frequency of the reporting of the irregularities and the reporting format to be used.

 

6.  The Commission or its representatives and the Court of Auditors shall have the power of audit, on the basis of documents and on-the-spot, over all grant beneficiaries, contractors and subcontractors who have received Union funds under this Regulation and the Specific Regulations.

 

7.  The European Anti-fraud Office (OLAF) may carry out investigations, including on-the-spot checks and inspections▌ in accordance with the provisions and procedures laid down in Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities' financial interests against fraud and other irregularities with a view to establishing whether there has been fraud, corruption or any other illegal activity affecting the financial interests of the ▌Union in connection with a grant agreement or grant decision or a contract funded under this Regulation and the Specific Regulations.

 

8.  Without prejudice to the ▌paragraphs 1, 6 and 7, cooperation agreements with third countries and international organisations, contracts, grant agreements and grant decisions ▌resulting from the implementation of this Regulation and the Specific Regulations shall contain provisions expressly empowering the Commission, the Court of Auditors and OLAF to conduct such audits and investigations, according to their respective competences.

▌

 

CHAPTER III

FINANCIAL FRAMEWORK FOR UNION ACTIONS, EMERGENCY AND TECHNICAL ASSISTANCE

 

Article 7

Implementation framework

1.  The Commission shall establish the overall amount made available for Union actions, emergency assistance and technical assistance at the initiative of the Commission under the annual appropriations of the Union budget.

 

2.  The Commission shall adopt, by way of implementing act, the work programme for Union actions and emergency assistance. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 55(3).

 

3.  To ensure a timely availability of resources, the Commission may separately adopt a work programme for emergency assistance.

 

4.  Union actions, emergency assistance and technical assistance at the initiative of the Commission may be implemented

–  directly, by the Commission or through executive agencies;

–  indirectly, by entities and persons other than Member States in accordance with Article ▌60 of the Financial Regulation.

 

Article 8

Emergency assistance

 

1.  In response to an emergency situation as defined in the Specific Regulations, the Commission may decide to provide emergency assistance. In such cases, it shall inform the European Parliament and the Council in a timely manner.

 

2.  Within the limits of the available resources, the emergency assistance may amount to 100% of the eligible expenditure.

 

3.  It may consist of assistance in Member States and in third countries in accordance with the objectives and actions defined in the Specific Regulations.

 

4.  Emergency assistance may support expenditure which was incurred prior to the date of submission of the grant application or the request for assistance, but not prior to 1 January 2014 when this is necessary for the implementation of the action.

 

5.  Emergency assistance may take the form of grants awarded directly to Union agencies.

 

Article 9

Union actions and emergency assistance in or in relation to third countries

 

1.  The Commission may decide to finance Union actions and emergency assistance in or in relation to third countries in accordance with the objectives and actions defined in the Specific Regulations.

 

2.  When such actions are implemented directly, the following entities shall be allowed to submit grant applications:

(a)  Member States;

(b)  third countries, in duly justified cases where a grant is necessary to achieve the objectives of this Regulation and the Specific Regulations;

(c)  joint bodies set up by the third countries and the Union or by Member States;

(d)  international organisations, including regional organisations, UN bodies, departments and missions, international financial institutions and development banks and institutions of international jurisdiction in so far as they contribute to the objectives of the Specific Regulation(s) concerned;

(e)  the International Committee of the Red Cross (ICRC), the International Federation of National Red Cross and Red Crescent Societies;

(f)  Non-governmental organisations established and registered in the Union and in the countries associated with the implementation, application and development of the Schengen acquis.

(g)  Union agencies for emergency assistance.

 

Article 10

Technical assistance at the initiative of the Commission

 

1.  At the initiative of or on behalf of the Commission, the Specific Regulations may support the preparatory, monitoring, administrative and technical assistance, evaluation, audit and control measures and activities necessary for the implementation of this Regulation and the Specific Regulations.

 

2.  Those measures and activities may include▌:

(a)  assistance for project preparation and appraisal;

(b)  support for institutional strengthening and administrative capacity building for the effective management of this Regulation and the Specific Regulations;

(c)  measures related to the analysis, management, monitoring, information exchange and implementation of this Regulation and the Specific Regulations, as well as measures relating to the implementation of control systems and technical and administrative assistance;

(d)  evaluations, expert reports statistics and studies, including those of a general nature concerning the operation of the Specific Regulations;

(e)  actions to disseminate information, support networking, carry out communication activities, raise awareness and promote cooperation and exchange of experience, including with third countries. To bring about greater efficiency in communication to the public at large and stronger synergies between the communication activities undertaken at the initiative of the Commission, the resources allocated to communication actions under this Regulation shall also contribute to covering the corporate communication of the political priorities of the European Union provided that these are related to the general objectives of this Regulation and the Specific Regulations;

(f)  the installation, updating, operation and interconnection of computerised systems for management, monitoring, audit, control and evaluation;

(g)  the design of a common framework for evaluation and monitoring as well as a system of indicators, taking into account, where appropriate, national indicators;

(h)  actions to improve evaluation methods and the exchange of information on evaluation practices;

(i)  conferences, seminars, workshops and other common information and training measures on the implementation of this Regulation and the Specific Regulations for designated authorities and beneficiaries;

(ia)  actions related to fraud detection and prevention;

(j)  actions related to audit.

 

3.  The actions may also concern the preceding and subsequent financial frameworks.

 

CHAPTER IV

NATIONAL PROGRAMMES

 

Section 1

Programming and Implementation framework

 

Article 10a

Programming

The objectives of the Specific Regulations shall be pursued within the framework of the multiannual programming for the period 2014 to 2020, subject to a mid-term review in accordance with Article 15.

 

Article 11

Subsidiary and proportional intervention

1.  Member States and the bodies designated by them for that purpose ("designated authorities") shall be responsible for implementing programmes and carrying out their tasks under this Regulation and the Specific Regulations at the appropriate level, in accordance with the institutional, legal and financial framework of the Member State and subject to compliance with this Regulation and the Specific Regulations.

 

2.  Arrangements for the implementation and use of the support provided under the Specific Regulations, and in particular the financial and administrative resources required in relation to the reporting, evaluation, management and control, shall take into account the principle of proportionality having regard to the level of support allocated, thereby reducing the administrative burden and facilitating efficient implementation.

 

 

Article 12

Partnership

 

1a.  Each Member State shall▌, in accordance with its national rules and practices and subject to any security requirements that apply, organise a partnership with ▌authorities and bodies which are relevant in that regard, to discharge the role set out in paragraph 3. The partnership shall be drawn from relevant public authorities at national, regional and local level, where applicable. It shall also, where deemed appropriate, include relevant international organisations▌, non-governmental organisations and social partners.

 

2.  Partnership shall be conducted in full compliance with the respective institutional, legal and financial jurisdiction of each partner category.

 

3.  Member State shall involve the partnership in the preparation, implementation, monitoring and evaluation of national programmes. The composition of the partnership may differ at different stages of the programme cycle.

 

4.  Each Member State shall set up a monitoring committee to support the implementation of national programmes.

 

5.  The Commission may provide guidance on the monitoring of national programmes and, where neccessary and in agreement with the Member State, may participate in the work of the monitoring committee in an advisory capacity.

 

Article 13

Policy dialogue

 

1.▌  In order to facilitate the preparation of the national programmes each Member State and the Commission shall hold a dialogue at the level of senior officials, taking into account the relevant indicative timeframes of Article 14. The dialogue shall focus on the overall results to be achieved by means of the national programmes in order to address the needs and priorities of the Member States in the areas of intervention covered by the Specific Regulation taking account of the baseline situation in the Member State concerned and the objectives of the Specific Regulations. The dialogue shall also serve as an opportunity for an exchange of views on Union Actions. The outcome of the dialogue will serve as a guide for the preparation and approval of the national programmes and will include an indication of the date expected for the Member State's submission of the national programmes to the Commission that will allow the timely adoption of the programme. This outcome shall be recorded in agreed minutes.

 

1a.  In case of actions to be implemented in and in relation to third countries, such actions shall not be directly development oriented and the policy dialogue shall seek full coherence with the principles and general objectives of the Union external action and foreign policy as regards the country or region concerned.

 

1b.  After the conclusion of the policy dialogues, the Commission shall inform the Parliament about the overall outcome.

 

1c.  If deemed appropriate by a Member State and the Commission, the policy dialogue may be repeated after the mid- term review referred to in Article 15, in order to reassess the needs of that Member State and the priorities of the Union.

▌

 

Article 14

Preparation and approval of national programmes

 

1.  Each Member State shall propose, on the basis of the conclusions of the policy dialogue referred to in Article 13(1), a multiannual national programme in accordance with the Specific Regulations.

 

2.  Each proposed national programme shall cover the financial years of the period from 1 January 2014 to 31 December 2020 and consist of the following elements:

 

(a)  a description of the baseline situation in the Member State, completed with the necessary factual information to assess the requirements correctly;

(b)  an analysis of requirements in the Member State and the national objectives designed to meet those requirements during the period covered by the programme;

(c)  an appropriate strategy identifying the objectives to be pursued with the support of the Union budget, with targets for their achievement, an indicative time table and examples of actions envisaged to meet these objectives;

(ca)  a description of how the objectives of the Specific Regulations are covered;

(d)  the mechanisms that ensure coordination between the instruments established by the Specific Regulations and other Union and national instruments;

(e)  information on the monitoring and evaluation framework to be put in place and the indicators to be used to measure the progress in the implementation of the objectives pursued in relation to the baseline situation in the Member State;

(ea) implementing provisions for the national programme containing the identification of the designated authorities, and a summary description of the envisaged management and control system;

(f)  a summary description of the approach chosen for the implementation of the partnership principle laid down in Article 12;

(g)  a draft financing plan indicatively broken down by each financial year of the period, including an indication of technical assistance expenditure;

(h)  the mechanisms and methods to be used to publicise the national programme▌.

▌

 

3.  Member States shall submit the proposed national programmes to the Commission no later than three months after the policy dialogue referred to in Article 13(1) is concluded.

 

4.  The national programmes shall be drawn up according to the model adopted by the Commission by implementing act. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 55(3).

 

5.  Before approving a proposed national programme, the Commission shall examine:

(a)    its consistency with the objectives of the Specific Regulations and the outcome of the policy dialogue referred to in Article 13(1);

(aa)  the distribution of the Union funding between objectives in the light of the requirements of the specific regulation and, where relevant, the justification for any deviation from the minimum shares set in the specific regulations.

(b)    the relevance of the objectives, targets, indicators, the time table and examples of actions envisaged in the proposed national programme in the light of the strategy▌ proposed by Member States;

(c)  the relevance of the implementing provisions referred to in point (fa) of paragraph 2 in the light of the actions envisaged;

(d)    the compliance of the proposed programme with Union law;

(e)  the complementarity with support provided by other Union Funds including the European Social Fund;

(f)  Where applicable under a Specific Regulation, for objectives and examples of actions in or in relation to third countries, coherence with the principles and objectives of the Union external action and foreign policy related to the country or region concerned.

 

6.  The Commission shall make observations within three months of the date of submission of the proposed national programme. Where the Commission considers that a proposed national programme is inconsistent with the objectives of the specific regulation, in the light of the national strategy or that the Union funding to be allocated to these objectives are insufficient or that the programme does not comply with Union law, it shall invite the Member State concerned to provide all necessary additional information and, where appropriate, to modify the proposed national programme.

 

7.  The Commission shall approve, ▌each national programme no later than six months following the formal submission by the Member State, provided that any observations made by the Commission have been adequately taken into account.

 

7a.  Without prejudice to paragraph 7, the Commission shall inform the European Parliament of the overall outcome of the application of paragraphs 5 and 6 of this Article, including compliance with or derogation from the minimum percentages set per objective in the relevant Specific Regulations.

 

8.  In the light of new or unforeseen circumstances, at the initiative of the Commission or the Member State concerned, an approved national programme may be re-examined and, if necessary, revised for the rest of the programming period.

 

Article 15

Mid term review

 

1.  In 2018 the Commission and each Member State shall re-examine the situation, in the light of the interim evaluation reports submitted by the Member States in accordance with Article 52(1)(a), the developments in Union policies and in the Member State concerned.

 

2.  Following this re-examination and in the light of its outcome, ▌national programmes may be revised.

 

3.  The rules laid down in Article 14 on the preparation and approval of national programmes shall apply mutatis mutandis to the preparation and approval of the revised national programmes.

 

4.  ▌After the completion of the mid term review and as part of the interim evaluation referred to in Article 52(2)(a), the Commission shall report on the mid-term review to the European Parliament, the Council, the European and Economic and Social Committee and the Committee of the Regions▌.

 

Article 16

Financing structure

 

1.  Financial contributions provided under the national programmes shall take the form of grants.

 

2.  Actions supported under the national programmes shall be co-financed by public or private sources, shall be of a non-profit nature and shall not be subject to funding from other sources covered by the Union budget.

 

3.  The contribution from the Union budget shall not exceed 75 % of the total eligible expenditure of a project.

 

4.  The contribution from the Union budget may be increased to 90% under specific actions or strategic priorities as defined in the Specific Regulations.

 

5.  The contribution from the Union budget may also be increased to 90% in exceptional duly justified circumstances, for example when, due to economic pressure on the national budget, projects would otherwise not be implemented and the objectives of the national programme would not be achieved.

 

6.  The contribution from the Union budget to the technical assistance at the initiative of Member States may amount to 100% of the total eligible expenditure.

 

Article 17

General Principles of Eligibility

 

1.  The eligibility of expenditure shall be determined on the basis of national rules, except where specific rules are laid down in this Regulation or in the Specific Regulations.

 

2.  In accordance with the Specific Regulations, for it to be eligible, expenditure must be:

(a)  within the scope of the Specific Regulations and their objectives;

(b)  needed to carry out the activities covered by the project concerned;

(c)  reasonable and comply with the principles of sound financial management, in particular value for money and cost-effectiveness.

 

3.  Expenditure shall be eligible for support under the Specific Regulation if:

–  it has been incurred▌ by a beneficiary between 1 January 2014 and 31 December 2022; and

–  it has been actually paid by the designated Responsible Authority between 1 January 2014 and 30 June 2023.

 

3a.  Expenditure shall also be eligible if it has been incurred between the entry into force of this Regulation and 1 January 2014 for technical and administrative assistance measures necessary to ensure the setting up of the management and control systems in the framework of Regulation XX/XXXX [ISF Police].

 

3b.  By way of derogation, expenditure paid in 2014 shall also be eligible where it has been paid by the Responsible Authority before its formal designation according to Article 24, provided that the management and controls systems applied before the formal designation is essentially the same as the one in force after the formal designation of the Responsible Authority.

 

4.  Expenditure included in payment requests from the beneficiary to the Responsible Authority shall be supported by invoices or accounting documents of equivalent probative value, except for forms of support under Article 18(1)(b), (c) and (d). For such forms of support, by way of derogation from paragraph 3, the amounts included in the payment request shall be the cost reimbursed to the beneficiary by the Responsible Authority.

 

5.  Net revenue directly generated by a project during its implementation which has not been taken into account at the time of approval of the project, shall be deducted from the eligible expenditure of the project at the latest in the final payment request submitted by the beneficiary.

 

Article 18

Eligible expenditure

 

1.  Eligible expenditure can be reimbursed in the following ways:

(a)  Reimbursement of eligible costs actually incurred and paid, together with, where applicable, depreciation;

(b)  standard scales of unit costs;

(c)  lump sums;

(d)  flat-rate financing determined by the application of a percentage to one or more defined categories of costs.

 

2.  The options referred to in paragraph 1 may be combined where each option covers▌ different categories of costs or where they are used for different projects forming a part of an action or for successive phases of an action.

 

3.  Where a project is implemented exclusively through the public procurement of works, goods or services, only point (a) of the first subparagraph of paragraph 1 shall apply. Where the public procurement within a project is limited to certain categories of costs, all the options referred to in paragraph 1 may be applied.

 

4.  The amounts referred to in point (b), (c) and (d) of the first subparagraph of paragraph 1 shall be established▌ in one of the following ways:

(a)  a fair, equitable and verifiable calculation method based on:

(i)  statistical data or other objective information; ▌

(ii)  the verified historical data of individual beneficiaries; or

(iii)  the application of the usual cost accounting practices of individual beneficiaries;

(b)  in accordance with the rules for application of corresponding scale of unit costs, lump sums and flat rates applicable in Union policies for a similar type of ▌project and beneficiary;

(c)  in accordance with the rules for application of corresponding scale of unit costs, lump sums and flat rates applied under schemes for grants funded entirely by the Member State for a similar type of ▌project and beneficiary▌.

 

5.  The document setting out the conditions for support for each project▌ shall set out the method to be applied for determining the costs of the project and the conditions for the payment of the grant.

 

6.  Where the implementation of a project gives rise to indirect costs, they may be calculated as a flat rate in one of the following ways:

(a)  a flat rate of up to 25% of eligible direct costs, provided that the rate is calculated on the basis of a fair, equitable and verifiable calculation method or a method applied under schemes for grants funded entirely by the Member State for a similar type of ▌project and beneficiary;

(b)  a flat rate of up to 15% of eligible direct staff costs without there being a requirement for the Member State to perform a calculation to determine the applicable rate; ▌

(c)  a flat rate applied to eligible direct costs based on existing methods and corresponding rates, applicable in Union policies for a similar type of ▌project and beneficiary.

▌

 

6a.  For the purposes of determining staff costs relating to the implementation of a project, the hourly rate applicable may be calculated by dividing the latest documented annual gross employment costs by 1720 hours.

▌

 

8.  In addition to the methods stipulated in paragraph 4, where the contribution from the Union budget does not exceed 100,000 EUR, the amounts referred to in paragraph 1(b), (c) and (d) may be established on a case-by-case basis by reference to a draft budget agreed ex ante by the Responsible Authority▌.

 

9.  Depreciation costs may be considered as eligible where the following conditions are fulfilled:

(a)  ▌the eligibility rules of the national programme allow for it;

(b)  the amount of the expenditure is duly justified by supporting documents having equivalent probative value to invoices for eligible costs where reimbursed in the form referred to in point (a) of the first subparagraph of paragraph(1);

(c)  the costs relate exclusively to the period of support for the project;

(d)  support from the Union budget has not contributed towards the acquisition of the depreciated assets.

 

9a.  Without prejudice to Article 38, for the purpose of paragraph 8 the Member States which have not adopted Euro as their national currency may use the Euro conversion rate fixed on the date of project approval or project agreement signature based on the monthly acounting exchange rate published electronically by the Commission and will not be subject to modification in course of the project.

 

 

Article 19

Ineligible expenditure

 

The following costs shall not be eligible for a contribution from the Union budget under the Specific Regulations:

 

(a)  interest on debt;

 

(b)  the purchase of land not built on;

 

(c)  the purchase of land built on, where the land is necessary for the implementation of the project, in the amount exceeding 10% of the total eligible expenditure for the project concerned;

 

(d)  value added tax except where it is non-recoverable under national VAT legislation▌.

 

Article 20

Technical assistance at the initiative of the Member States

1.  At the initiative of a Member State for each national programme, the Specific Regulations may support actions for preparation, management, monitoring, evaluation, information and communication, networking, control and audit, as well as measures for the reinforcement of the administrative capacity for the implementation of this Regulation and the Specific Regulations.

 

2.  Those measures may include

(a)  expenditure relating to the preparation, selection, appraisal, management and monitoring of the programme, actions or projects;

(b)  expenditure relating to audits and on-the-spot controls of actions or projects;

(c)  expenditure relating to evaluations of the programme, actions or projects;

(d)  expenditure relating to information, dissemination and transparency in relation to the programme, actions or projects, including expenditure resulting from the application of Article 48 and expenditure for campaigns to inform and raise awareness about the programme’s purpose, organised i.a. at a local level;

(e)  expenditure on the acquisition, installation and maintenance of computerised systems for the management, monitoring and evaluation of this Regulation and the Specific Regulations;

(f)  expenditure on meetings of monitoring committees and sub-committees relating to the implementation of actions; this expenditure may also include the costs of experts and other participants in these committees, including third-country participants, where their presence is essential to the effective implementation of programmes, actions or projects;

(g)  expenditure for the reinforcement of the administrative capacity for the implementation of this Regulation and the Specific Regulations.

 

3.  The appropriations may be used by the Member States to support actions for the reduction of administrative burden for beneficiaries and competent authorities referred to in Article 23, including electronic data exchange systems, and actions to reinforce the capacity of Member State authorities and beneficiaries to administer and to use the support provided for under the Specific Regulations.

4.  The actions may also concern the preceding and subsequent financial frameworks.

5.  When one or more competent authorities are common to more than one national programme, the appropriations for the technical assistance expenditure on each of the programmes concerned may be merged, partly or entirely.

 

Section 2

Management and Control

 

Article 21

General principles of management and control systems

 

For the implementation of its national programme, each Member State shall set up management and control systems, which shall provide for:

 

(a)  a description of the functions of each authority involved in management and control, and the allocation of functions within each authority;

 

(b)  compliance with the principle of separation of functions between and within such authorities;

 

(c)  procedures for ensuring the correctness and regularity of expenditure declared;

 

(d)  computerised systems for accounting, for the storage and transmission of financial data and data on indicators, for monitoring and for reporting;

 

(e)  systems for reporting and monitoring where the Responsible Authority entrusts execution of tasks to another body;

 

(f)  arrangements for auditing the functioning of the management and control systems;

 

(g)  systems and procedures to ensure an adequate audit trail;

 

(h)  the prevention, detection and correction of irregularities, including fraud, and the recovery of amounts unduly paid, together with any interest on late payments.

 

Article 21a

Responsibilities under shared management

 

In accordance with the principle of shared management, Member States and the Commission shall be responsible for the management and control of national programmes in accordance with their respective responsibilities laid down in this Regulation and the Specific Regulations.

 

Article 21b

Responsibilities of beneficiaries

 

Beneficiaries shall fully cooperate with the Commission and designated authorities when these are carrying out their functions and tasks in relation to this Regulation and the Specific Regulations.

 

Article 22

Responsibilities of Member States

 

1.  Member States shall fulfil the management, control and audit obligations and assume the resulting responsibilities, which are laid down in the rules on shared management set out in the Financial Regulation and this Regulation▌.

 

2.  Member States shall ensure that their management and control systems for national programmes are set up in accordance with the provisions of this Regulation and that those systems function effectively.

 

3.  Member States shall allocate adequate resources for each competent authority to carry out their functions throughout the programming period.

 

4.  Member States shall set up transparent rules and procedures for the selection and implementation of projects in accordance with this Regulation and the Specific Regulations.

 

5.  All official exchanges of information between the Member State and the Commission shall be carried out using an electronic data exchange system. The Commission shall adopt implementing acts establishing the terms and conditions with which that electronic data exchange system is to comply. Those implementing acts shall be adopted in accordance with the examination procedure referred to in article 55(3).

 

Article 23

Competent authorities

 

1.  The competent authorities are:

▌

(b)  an ▌Responsible Authority: a public sector body of the Member State, which is the designated body in the sense of Article 59 of the Financial Regulation and shall be solely responsible for the proper management and control of the national programme and shall handle all communication with the Commission;

(c)  an Audit Authority: a national public authority or body, which is functionally independent of the Responsible Authority▌ and which shall be responsible to issue annually the opinion referred to in the second subparagraph of Article 59(5) of the Financial Regulation;

(d)  where appropriate, one or more Delegated Authority(ies): any public or private body which carries out certain tasks of the Responsible Authority under the responsibility of that Authority.

 

2.  Each Member State shall lay down rules governing the relations between the authorities referred to in paragraph 1 and their relations with the Commission.

 

Article 24

Designation of Responsible Authorities

 

1.  In accordance with Article 59(3)▌ of the Financial Regulation, Member States shall notify the Commission about the formal designation at ministerial level of the Responsible Authorities in Member States responsible for the management and control of expenditure under this Regulation, as soon as possible after the decision adopting national programme.

 

2.  The designation shall be granted subject to the body complying with the designation criteria on internal environment, control activities, information and communication, and monitoring laid down in or on the basis of this Regulation.

 

3.  The designation shall be based on an opinion of an ▌audit body, which may be the Audit Authority, that assesses the Responsible Authority’s compliance with the designation criteria. This body may be the autonomous public institution responsible for monitoring, evaluation and audit of the administration. The audit body shall function independently from the Responsible Authority and shall carry out its work in accordance with internationally accepted audit standards. In accordance to Article 59(3) of the Financial Regulation, Member States may base their decision on designation on whether the management and control systems are essentially the same as those in place for the previous period and have functioned effectively. If the existing audit and control results show that the designated bodies no longer comply with the designation criteria, Member States shall take the measures necessary to ensure that deficiencies in the implementation of the tasks of these bodies are remedied, including by ending the designation.

▌

 

5.  To ensure the sound operation of this system, the Commission shall be empowered to adopt delegated acts in accordance with the procedure referred to in Article 54 concerning:

(a)  minimum conditions for the designation of the Responsible Authorities with regard to the internal environment, control activities, information and communication, and monitoring, as well as rules on the procedure for granting and ending designation;

(b)  rules relating to supervision and the procedure for reviewing designation of Responsible Authorities;

(c)  the obligations of the Responsible Authorities as regards public intervention, as well as on the content of their management and control responsibilities.

 

Article 25

General principles on controls by Responsible Authorities

 

1.  Responsible Authorities shall carry out a systematic administrative control▌ and shall supplement them by on the spot controls, including, where appropriate, unannounced on-the-spot controls of the expenditure related to the final payment requests from the beneficiaries that are declared in the annual accounts in view of obtaining a sufficient level of assurance.

 

2.  As regards▌ on-the-spot controls, the Responsible Authority shall draw its control sample from the entire population of beneficiaries comprising, where appropriate, a random part and a risk-based part, in order to obtain a representative error rate and a minimum confidence level, while targeting also highest errors.

 

3.  The Responsible Authority shall draw up a control report on each on-the-spot control.

 

4.  Where problems detected appear to be systemic in nature and may therefore entail a risk to other projects, the Responsible Authority shall ensure that further examination is carried out, including additional controls where necessary, to establish the scale of such problems and whether the error rate is above the acceptable level. The necessary preventive and corrective measures shall be taken by the Responsible Authority and communicated to the Commission in the summary report referred to in Article 59(5)b of the Financial Regulation.

 

5.  The Commission shall, by means of implementing acts, adopt the necessary rules aiming at reaching a uniform application of this Article. These rules may in particular relate to the following:

(a)  the rules concerning administrative and on-the-spot controls including unannounced on-the-spot controls, to be conducted by the Responsible Authority with regard to the respect of obligations, including how long supporting documents should be kept, commitments and eligibility rules resulting from the application of this Regulation and the Specific Regulations;

(b)  the rules on the minimum level of on-the-spot controls necessary for an effective management of the risks, as well as the conditions under which Member States have to increase such controls, or may reduce them where the management and control systems function properly and the error rates are at an acceptable level;

(c)  the rules and methods on the reporting of the controls and verification carried out and their results.

Those implementing acts shall be adopted by the Commission in accordance with the examination procedure referred to in Article 55(3).

 

Article 26

Payment to beneficiaries

 

Responsible Authorities shall ensure that the beneficiaries receive the total amount of the public support as quickly as possible and in full. No amount shall be deducted or withheld and no specific charge or other charge with equivalent effect shall be levied that would reduce these amounts for the beneficiaries.

 

Article 27

Functions of the audit authority

1.  To support the opinion given according to Article 59 of the Financial Regulation the audit authority shall ensure that audits are carried out on the management and control systems, and on an appropriate sample of the expenditure included in the annual accounts. The Commission shall be empowered to adopt delegated acts in accordance with the procedure referred to in Article 54 on the status of the Audit Authorities and the conditions which their audits shall fulfil.

 

2.  Where audits are carried out by a body other than the Audit Authority, the Audit Authority shall ensure that any such body has the necessary specialist expertise and functional independence.

 

3.  The Audit Authority shall ensure that audit work is in accordance with internationally accepted auditing standards.

 

Article 28

Cooperation with audit authorities

 

1.  The Commission shall cooperate with audit authorities to coordinate their respective audit plans and methods and shall as soon as possible exchange the results of audits carried out on management and control systems in order to make the best possible and proportionate use of control ressources and to avoid unjustified duplication of work.

 

2.  The Commission and the audit authorities shall meet on a regular basis▌ to exchange views on issues relating to improvement of the management and control systems.

 

Article 29

Controls and audits by the Commission

 

1.  The Commission shall rely on available information, including the designation procedure, request for payment of the annual balance as referred to in Article 39, annual implementation reports, and audits carried out by national and Union bodies, to assess that the Member States have set up management and control systems that comply with this Regulation and that those systems function effectively during the implementation of national programmes.

 

2.  Without prejudice to audits carried out by Member States, Commission officials or authorised Commission representatives may carry out on-the-spot audits or controls subject to giving at least 12 working days notice to the competent national authority except in urgent cases. The Commission shall respect the principle of proportionality by taking into account the need to avoid unjustified duplication of audits or controls carried out by Member States, the level of risk to the budget of the Union and the need to minimise the administrative burden on beneficiaries. Officials or authorised representatives of the Member State may take part in such audits or controls.

 

3.  The scope of the audits or controls may include, in particular:

(a)  the verification of the effective functioning of management and control systems in a national programme or a part thereof;

(b)  the compliance of administrative practices with Union rules;

(c)  the existence of the required supporting documents and their correlation with the actions supported under the national programmes;

(d)  the terms on which the actions have been undertaken and controlled;

(e)  an assessment of the sound financial management of actions and/or the national programme.

 

4.  Commission officials or authorised Commission representatives, duly empowered to carry out on-the-spot audits or controls, shall have access to all necessary records, documents and metadata, irrespective of the medium in which they are stored, relating to projects and technical assistance or to management and control systems. Member States shall provide copies of such records, documents and metadata to the Commission upon request. The powers set out in this paragraph shall not affect the application of national provisions which reserve certain acts for agents specifically designated by national legislation. Commission officials and authorised representatives shall not take part, inter alia, in home visits or the formal questioning of persons within the framework of national legislation. However, they shall have access to the information thus obtained without prejudice to the competences of national courts and in full respect of the fundamental rights of the legal subjects concerned.

 

5.  At the request of the Commission and with the agreement of the Member State, additional controls or inquiries into the actions covered by this Regulation shall be undertaken by the competent bodies of that Member State. Commission agents or persons delegated by the Commission may take part in such controls. In order to improve controls, the Commission may, with the agreement of the Member States concerned, request the assistance of the authorities of those Member States for certain controls or inquiries.

 

6.  The Commission may require a Member State to take the actions necessary to ensure the effective functioning of its management and control systems or the correctness of expenditure in accordance with the applicable rules.

 

Section 3

Financial Management

 

Article 30

Budget commitments

 

1.  The budget commitments of the Union in respect of each national programme shall be made in annual instalments during the period from 1 January 2014 to 31 December 2020.

 

2.  The decision of the Commission ▌approving a national programme shall constitute the financing decision within the meaning of Article 84 of the Financial Regulation▌ and once notified to the Member State concerned, a legal commitment within the meaning of that Regulation.

 

3.  For each national programme, the budget commitment for the first instalment shall follow the approval of the national programme by the Commission.

 

4.  The budget commitments for subsequent instalments shall be made by the Commission before 1 May of each year, on the basis of the decision referred to in the second paragraph ▌ of this Article, except where Article 16 of the Financial Regulation applies.

 

Article 31

Common rules for payments

 

1.  Payments by the Commission of the contribution from the Union budget to the national programme shall be made in accordance with budget appropriations and subject to available funding. Each payment shall be posted to the earliest open budget commitment concerned.

 

2.  Payments shall take the form of initial pre-financing, annual pre-financing, payments of the annual balance and the payment of the final balance.

 

3.  Article 90 of the Financial Regulation shall apply.

 

Article 32

Accumulation of initial pre-financing and annual balances

 

1.  The total of the initial pre-financing payment and the payments of the annual balance shall not exceed 95 % of the contribution from the Union budget to the national programme.

 

2.  When the ceiling of 95 % is reached, the Member States may continue transmitting requests for payment to the Commission.

 

Article 33

Pre-financing arrangements

 

1.  Following the Commission decision approving the national programme, an initial pre-financing amount for the whole programming period shall be paid by the Commission to the designated Responsible Authority. This shall represent 4% of the total contribution from the Union budget to the national programme concerned. It may be split into two instalments depending on budget availability within 4 months.

1a.  An annual pre-financing amount of 3% of the total contribution from the Union budget to the national programme concerned shall be paid before 1 February in 2015. In the years 2016 to 2022 it shall be 5% of the total contribution from the Union budget to the national programme concerned.

 

2.  If a national programme is approved in 2015 or later, the initial pre-financing and annual pre-financing, shall be paid not later than sixty days after the approval of the national programme depending on budget availability.

 

2a.  In case of amendments to the total contribution from the Union budget to a national programme, the initial as well as the annual pre-financing amounts shall be revised accordingly and reflected in the financing decision.

 

3.  Pre-financing shall be used▌ for making payments to beneficiaries implementing the national programme as well as for competent authorities for expenditure relating to technical assistance. It shall be made available without delay to the Responsible Authority for these purposes.

 

Article 33a

Clearance of pre-financing

 

1.  The amount paid as initial pre-financing shall be totally cleared from the Commission accounts in accordance with Article 36 at the latest when the national programme is closed.

 

2.  The amount paid as annual pre-financing shall be cleared from the Commission accounts in accordance with Article 35.

 

3.  The total amount paid as pre-financing shall be reimbursed to the Commission if no payment request in accordance with Article 39 is sent within 36 months of the date on which the Commission pays the first instalment of the initial prefinancing amount.

 

4.  Interest generated on the initial prefinancing shall be posted to the national programme concerned and deducted from the amount of public expenditure indicated on the final payment request.

 

Article 33b

Internal assignment of revenue

 

1.  The following shall be regarded as internal assigned revenue within the meaning of Article 21 of the Financial Regulation:

(i)  Sums which, under Articles 40 and 42, shall be paid to the Union budget, including interest thereon,

(ii)  Sums which, following the closure of programmes under the preceding multiannual financial framework, shall be paid to the Union budget, including interest thereon.

 

2.  The sums referred to in paragraph 1 shall be paid to the Union budget and, in the event of reuse, shall be used in the first instance to finance expenditure under the Specific Regulations.

 

Article 34

Definition of the financial year

 

For the purpose of this Regulation the financial year, as referred in Article 59 of the Financial Regulation, shall cover expenditure paid and revenue received and entered into the accounts of the Responsible Authority in the period beginning on 16 October in the year "N-1" and ending on 15 October of year "N".

 

Article 35

Payment of the annual balance

 

1.  The Commission shall pay the annual balance, ▌on the basis of the financial plan in force, the annual accounts for the corresponding financial year of the national programme and the corresponding clearance decision.

 

2.  The annual accounts shall cover the payments made by the Responsible Authority, including the payments relating to technical assistance, during the financial year for which the control requirements referred to in Article 25 have been met.

 

3.  Depending on budget availability, the annual balance shall be paid not later than six months after the information and documents mentioned in Article 39(1) and Article 49 are considered admissible by the Commission and the latest annual account have been cleared.

 

Article 36

Closure of the programme

 

1.  Member States shall submit the following documents by 31 December 2023 at the latest:

(a)  The information required for the last annual accounts, in accordance with Article 39(1);

(b)  a request for payment of the final balance; and

(c)  the final implementation report for the national programme as referred to in Article 49(1).

 

2.  The payments made by the Responsible Authority from 16 October 2022 to 30 June 2023 shall be included in the last annual accounts.

 

3.  After receiving the documents listed in paragraph 1, the Commission shall pay the final balance, ▌on the basis of the financial plan in force, the last annual accounts and the corresponding clearance decision.

 

4.  Depending on budget availability, the final balance shall be paid no later than three months after the date of clearance of accounts of the final financial year or one month after the date of acceptance of the final implementation report, whichever date is later. The amounts still committed after the balance is paid shall be decommitted by the Commission within a period of six months, without prejudice to Article 47.

 

Article 37

Interruption of the payment deadline

 

1.  The payment deadline following a request for payment may be interrupted by the authorising officer by delegation within the meaning of the Financial Regulation for a maximum period of six months, when at least one of the following conditions is met:

(a)  following information provided by a national or Union audit body, there is clear evidence to suggest a significant deficiency in the functioning of the management and control system;

(b)  the authorising officer by delegation has to carry out additional verifications following information coming to his attention alerting him that expenditure in a payment request is linked to an irregularity having serious financial consequences;

(c)  one or more documents required under Article 39(1) were not submitted.

 

The Member State may agree to an extension of the interruption period for another three months.

 

2.  The authorising officer by delegation shall limit the interruption to the part of the expenditure covered by the payment request affected by the elements referred to in the first subparagraph of paragraph 1 unless it is not possible to identify the part of expenditure affected. The authorising officer by delegation shall inform the Member State and the Responsible Authority in writing immediately of the reason for interruption and shall ask them to remedy the situation. The interruption shall be ended by the authorising officer by delegation as soon as the necessary measures have been taken.

 

Article 37a

Suspension of payments

 

1.  All or part of the annual balance may be suspended by the Commission where:

(a)  there is a serious deficiency in the effective functioning of the management and control system of the national programme which has put at risk the Union contribution to the national programme and for which corrective measures have not been taken; or

(b)  expenditure in the annual accounts is linked to an irregularity having serious financial consequences which has not been corrected; or

(c)  the Member State has failed to take the necessary action to remedy the situation giving rise to an interruption under Article 37.

 

2.  The Commission may decide to suspend all or part of an annual balance after having given the Member State the opportunity to present its observations▌.

 

3.  The Commission shall end suspension of all or part of an annual balance where the Member State has taken the necessary measures to enable the suspension to be lifted. ▌

 

Article 38

Use of the euro

 

1.  Amounts set out in national programmes submitted by Member States, forecasts of expenditure, statements of expenditure, ▌requests for payments, annual accounts and expenditure mentioned in the annual and final implementation reports shall be denominated in euro.

 

2.  Member States which have not adopted the euro as their currency on the date of a payment request shall convert the amounts of expenditure incurred in national currency into euro. This amount shall be converted into euro using the monthly accounting exchange rate of the Commission in the month during which the expenditure was registered in the accounts of the Responsible Authority of the national programme concerned. The exchange rate shall be published electronically by the Commission each month.

 

3.  When the euro becomes the currency of a Member State, the conversion procedure set out in paragraph 2 shall continue to apply to all expenditure recorded in the accounts by the Responsible Authority before the date of entry into force of the fixed conversion rate between the national currency and the euro.

 

Section 4

Clearance of accounts and financial corrections

 

Article 39

Request for payment of the annual balance

 

1.  By 15 February of the year following the financial year, each Member State shall submit to the Commission the documents and information required by Article 59(5) of the Financial Regulation. The documents submitted will serve as the request for payment of the annual balance. The deadline of 15 February may be exceptionally extended by the Commission to 1 March at the latest upon communication by the Member State concerned. Member States may, at the appropriate level, publish this information.

▌

 

2.  The Commission may ask a Member State to provide further information for the purpose of the annual clearance of account. If a Member State does not provide the requested information by the deadline for its submission set by the Commission, the Commission may take its decision on the clearance of the accounts on the basis of the information in its possession.

▌

 

4.  The documents referred to in paragraph 1 shall be drawn up according to the models adopted by the Commission by means of implementing acts. Those implementing acts shall be adopted by the Commission in accordance with the advisory procedure referred to in Article 55(2).

 

Article 40

Annual clearance of accounts

 

1.  By 31 May of the year following the financial year, the Commission shall decide on the clearance of the annual accounts for each national programme. The clearance decision shall cover the completeness, accuracy and veracity of the annual accounts submitted and be without prejudice to any subsequent financial corrections.

 

2.  The Commission shall, by means of implementing acts, lay down the modalities for the implementation of the annual clearance of accounts procedure, as regards the measures to be taken in connection to the adoption of the decision and its implementation, including on the exchange of information between the Commission and the Member States and the deadlines to be respected. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 55(3).

 

Article 41

Financial corrections by the Member States

 

Member States shall make the financial corrections required in connection with individual and or systematic irregularities▌ detected under the national programmes. Financial corrections shall consist of cancelling all or part of the contribution from the Union budget concerned. The Member States shall take into account the nature and gravity of the irregularities and the financial loss to the Union budget and shall apply a proportionate correction. Amounts cancelled and amounts recovered, as well as the interest thereon, shall be reallocated to the national programme concerned, excluding the amounts resulting from irregularities identified by the European Court of Auditors and the Commission services including OLAF. After the closure of the national programme, the Member State shall refund the sums recovered to the Union budget.

 

Article 42

Conformity clearance and financial corrections by the Commission

 

1.  The Commission shall make financial corrections by cancelling all or part of the Union contribution to a national programme and effecting recovery from the Member State in order to exclude from Union financing expenditure which is in breach of applicable▌ law, including in relation to deficiencies in the management and control systems of Member States which have been detected by the Commission or the European Court of Auditors.

 

2.  A breach of applicable▌ law shall lead to a financial correction only in relation to expenditure which has been declared to the Commission and where one of the following conditions is met:

(a)  the breach has▌ affected the selection of a project under the national programme or in cases where, due to the nature of the breach, it is not possible to establish that impact but there is a substantiated risk that the breach has had such an effect;

(b)  ▌the breach has▌ affected the amount of expenditure declared for reimbursement by the ▌ budget of the Union or in cases where, due to the nature of the breach, it is not possible to quantify its financial impact but there is a substantiated risk that the breach has had such an effect.

 

3.  When deciding on▌ a financial correction under paragraph 1, the Commission shall respect the principle of proportionality by taking account of the nature and gravity of the breach of applicable ▌law and its financial implications for the ▌budget of the Union.

 

4.  Before the adoption of any decision to refuse financing, the findings from the Commission and the Member State's replies shall be notified in writing, following which the two parties shall attempt to reach agreement on the action to be taken.

 

5.  Financing may not be refused for:

(a)  expenditure which is incurred by the Responsible Authority more than 36 months before the Commission notifies the Member State in writing of its findings;

(b)  expenditure on multiannual actions within the scope of the national programmes, where the final obligation on the beneficiary occurs more than 36 months before the Commission notifies the Member State in writing of its findings;

(c)  expenditure on actions in national programmes, other than those referred to in point (b) of this paragraph, for which the payment or, as the case may be, the final payment, by the Responsible Authority, is made more than 36 months before the Commission notifies the Member State in writing of its findings.

 

6.  The Commission shall, by means of implementing acts, lay down the modalities for the implementation of the conformity clearance as regards the measures to be taken in connection with the adoption of the decision and its implementation, including the information exchange between the Commission and the Member States and the deadlines to be respected. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 55(3).

 

Article 43

Obligations of Member States

 

A financial correction by the Commission shall not prejudice the Member State's obligation to pursue recoveries under Article 21(h) of this Regulation and to recover State aid in the meaning of Article 107(1) of the Treaty and under Article 14 of Council Regulation (EC) No 659/1999[9].

 

Article 44

Repayment

 

1.  Any repayment due to be made to the general budget of the Union shall be effected before the due date indicated in the order for recovery drawn up in accordance with Article 80 of the Financial Regulation. The due date shall be the last day of the second month following the issuing of the order.

 

2.  Any delay in effecting repayment shall give rise to interest on account of late payment, starting on the due date and ending on the date of actual payment. The rate of such interest shall be one-and-a-half percentage points above the rate applied by the European Central Bank in its main refinancing operations on the first working day of the month in which the due date falls.

 

Section 5

Decommitment

 

Article 45

Principles

 

1.  National programmes shall be submitted to a decommitment procedure established on the basis that amounts linked to a commitment which are not covered by the initial and annual pre-financing referred to in Article 33 and a request for payment in accordance with Article 39 by 31 December of the second year following that of the budget commitment shall be decommitted. For the purpose of the decommitment, the Commission shall calculate the amount by adding one sixth of the annual budget commitment related to the 2014 total amount contribution to each of the 2015 to 2020 budget commitments.

 

1a.  By way of derogation from paragraph 1, the deadlines for decommitment shall not apply to the annual budget commitment related to the 2014 total annual contribution.

 

1b.  If the first annual budget commitment is related to the 2015 total annual contribution, by way of derogation from paragraph 1, the deadlines for decommitment shall not apply to the annual budget commitment related to the total annual contribution of 2015. In such cases, the Commission shall calculate the amount under paragraph 1 by adding one fifth of the annual budget commitment related to the 2015 total amount contribution to each of the 2016 to 2020 budget commitments.

 

2.  The commitment related to the last year of the period will be decommitted according to the rules followed for the closure of the programmes.

 

3.  Any commitment still open on the latest date for expenditure to be eligible as referred to in Article 17(3) for which a payment request has not been made by the Responsible Authority within six months after that date shall be automatically decommitted.

 

Article 46

Exceptions to the decommitment

 

1.  The amount concerned by decommitment shall be reduced by the amounts that the Responsible Authority has not been able to declare to the Commission because of:

(a)  actions suspended by a legal proceeding or by an administrative appeal having suspensory effect; or

(b)  reasons of force majeure seriously affecting implementation of all or part of the national programme. Responsible Authorities claiming force majeure shall demonstrate the direct consequences of the force majeure on the implementation of all or part of the national programme.

 

The reduction may be requested once if the suspension or force majeure lasted up to one year, or several times corresponding to the duration of the force majeure or the number of years between the date of the legal or administrative decision suspending the implementation of the action and the date of the final legal or administrative decision.

 

2.  The Member State shall send the Commission information on the exceptions referred to in paragraph 1 by 31 January for the amount to be declared by the end of preceding year.

 

3.  The part of the budget commitments for which a payment request has been made but payment of which has been reduced or suspended by the Commission at 31 December of year N + 2 shall be disregarded in calculating the automatic decommitment.

 

Article 47

Procedure

 

1.  Whenever there is a risk of application of decommitment under Article 45 the Commission shall inform the Member States as soon as possible.

 

2.  On the basis of the information it has on 31 January, the Commission shall inform the Responsible Authority of the amount of the decommitment resulting from the information in its possession.

 

3.  The Member State shall have two months to agree to the amount to be decommitted or to submit its observations.

 

4.  The Commission shall carry out the automatic decommitment not later than nine months after the last time-limit resulting from the application of paragraphs 1 to 3.

 

5.  In the event of automatic decommitment, the contribution from the Union budget to the national programme concerned shall be reduced, for the year in question, by the amount automatically decommitted. The Union contribution in the financing plan will be reduced pro-rata, unless the Member State produces a revised financing plan.

 

CHAPTER V

INFORMATION, COMMUNICATION, MONITORING, EVALUATION AND

REPORTING

 

Article 48

Information and publicity

 

1.  Member States and Responsible Authorities shall be responsible for:

(a)  ▌a website or a website portal providing information on and access to the national programmes in that Member State;

(b)  informing potential beneficiaries about funding opportunities under the national programmes;

(c)  publicising to Union citizens the role and achievements of the Specific Regulations through information and communication actions on the results and impact of the national programmes.

 

2.  Member States shall ensure transparency on the implementation of the national programmes and maintain a list of actions supported by each national programme which shall be accessible through the website or the website portal. The list of actions shall include updated information about the final beneficiaries, the names of the projects and the amount of Union funding allocated to them.

 

2a.  As a rule, information shall be made public except where it is restricted due to its confidential nature, particulary concerning security, public order, criminal investigations and protection of personal data.

 

3.  The Commission shall be empowered to adopt by delegated acts in accordance with the procedure referred to in Article 54 to lay down rules concerning the information and publicity measures for the public and information measures for beneficiaries.

 

4.  The Commission shall, by means of implementing acts, define the technical characteristics of information and publicity measures. Those implementing acts shall be adopted by the Commission in accordance with the examination procedure referred to Article 55(3).

 

Article 49

Implementation reports

 

1.  By 31 March 2016 and by 31 March of each subsequent year until and including 2022, the Responsible Authority shall submit to the Commission an annual report on implementation of each national programme in the previous financial year and may, at the appropriate level, publish this information. The report submitted in 2016 shall cover the financial years 2014 and 2015. The Member State shall submit a final report on implementation of the national programmes by 31 December 2023.

 

2.  Annual implementation reports shall set out information on:

(a)  implementation of the national programme by reference to the financial data and the indicators;

(b)  any significant issues which affect the performance of the national programme.

 

3.  In the light of the mid-term review, the annual implementation report submitted in 2017 shall set out and assess:

(-a)  the information referred to in paragraph 2▌;

(a)  the progress towards achieving the objectives in the national programmes pursued with the contribution from the Union budget▌;

(b)  the involvement of relevant partners as referred to in article 12.

 

4.  The annual implementation report submitted in 2020 and the final implementation report shall, in addition to the information and assessment set out in paragraph▌ 2 ▌include information on and assess progress towards achieving the objectives of the national programme, bearing in mind the outcome of the policy dialogue.

 

5.  The annual implementation reports referred to in paragraphs 1 to 4 shall be admissible where they contain all the information required in those paragraphs. The Commission shall inform the Member State within 15 working days from the date of receipt of the annual implementation report if it is not admissible, failing which it shall be deemed admissible.

 

6.  The Commission shall inform the Member State of its observations on the annual implementation report within two months from the receipt of the annual implementation report. Where the Commission does not provide observations within this deadline, the reports shall be deemed to be accepted.

 

7.  The Commission may make observations to issues in the Responsible Authority’s annual implementation report, which affect the implementation of the national programme. Where such observations are made, the Responsible Authority shall provide necessary information with regard to these observations and, where appropriate, inform the Commission within three months of the▌ measures taken.

 

8.  The annual and final implementation reports shall be drawn up according to the models adopted by the Commission. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 55(2).

 

Article 50

The common monitoring and evaluation framework

 

1.  The Commission shall carry out regular monitoring of this Regulation and the Specific Regulations, where appropriate, in cooperation with the Member States.

 

2.  The implementation of the Specific Regulations shall be evaluated by the Commission in partnership with the Member States in accordance with Article 52.

 

3.  A common monitoring and evaluation framework shall be established with a view to measuring the relevance, effectiveness, efficiency, added value, sustainability of the actions and the simplification and the reduction of administrative burden, in the light of the objectives of this Regulation and the Specific Regulations and the performance of this Regulation and the Specific Regulations as instruments contributing to the development of the area of freedom, security and justice.

 

4.  The Commission shall be empowered to adopt delegated acts in accordance with the procedure referred to in Article 54 to develop further the common monitoring and evaluation framework.

 

5.  Member States shall provide the Commission with ▌the necessary information ▌to permit the monitoring and evaluation of this Regulation and the Specific Regulations.

 

6.  The Commission shall also consider the complementarity between the actions implemented under the Specific Regulations and those pursued under other relevant Union policies, instruments and initiatives.

 

6a.  The Commission shall pay particular attention to monitoring and evaluation of actions and programmes related to third countries, in accordance with Article 9.

 

Article 51

Evaluation of national programmes by Member States

 

1.  Member States shall carry out the evaluations referred to in Article 52(1). The evaluation to be carried out in 2017 shall contribute to improving the quality of the design and the implementation of national programmes, in accordance with the common monitoring and evaluation framework.

 

2.  In this regard, Member States shall ensure that procedures are in place to produce and collect the data necessary for the evaluations, including data related to indicators in the common monitoring and evaluation framework.

 

3.  The evaluations referred to in Article 52(1) shall be carried out by▌ experts that are functionally independent of the Responsible Authorities, Audit Authorities and Delegated Authorities. These experts may be affiliated with an autonomous public institution responsible for monitoring, evaluation and audit of the administration. The Commission shall provide guidance on how to carry out evaluations.

 

4.  The evaluations referred to in Article 52(1) shall be made public in their entirety except where information is restricted due to its confidential nature, particularly concerning security, public order, criminal investigations and protection of personal data.

 

Article 52

Evaluation reports by the Member States and the Commission

 

1.  In accordance with the common monitoring and evaluation framework, the Member States shall submit to the Commission:

(a)  an interim evaluation report on the implementation of actions and progress towards achieving the objectives of the national programmes by 31 December 2017;

(b)  an ex-post evaluation report on the effects of actions under the national programmes by 31 December 2023.

 

2.  On the basis of the reports referred to in paragraph 1, the Commission shall submit to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions:

(a)  an interim evalution report on the implementation of this Regulation and the Specific Regulations at the level of the Union by 30 June 2018. The report shall also include an assessment of the mid-term review carried out in accordance with the provisions of this Regulation and the Specific Regulations;

(b)  an ex-post evaluation report on the effects of this Regulation and the Specific Regulations, following the closure of the national programmes, by 30 June 2024.

 

3.  The ex-post evaluation of the Commission shall also examine the impact of the Specific Regulations on the development of the area of freedom, security and justice in terms of their contribution to the following objectives:

(a)  the development of a common culture of border security, law enforcement cooperation and crisis management;

(b)  effective management of migration flows into the EU;

(c)  the development of the Common European Asylum System;

(d)  fair and equal treatment of third-country nationals;

(e)  solidarity and co-operation between Member States in addressing migration and internal security issues;

(f)  a common approach of the Union on migration and security towards third countries.

 

▌

 

3a.  All evaluation reports under this Article shall be published in their entirety except where information is restricted due to its confidential nature, particularly concerning security, public order, criminal investigations and protection of personal data.

 

CHAPTER VI

▌FINAL PROVISIONS

 

Article 54

Exercise of the delegation

 

1.  The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.

 

2.  The delegation of power referred to in this Regulation shall be conferred on the Commission for a period of seven years from the entry into force of this Regulation. The Commission shall draw up a report in respect of the delegation of power not later than nine months before the end of the seven year period. The delegation of powers shall be tacitly extended for a period of three years, unless the European Parliament or the Council opposes such extension not later than three months before the end of each period.

 

3.  The delegation of powers referred to in this Regulation may be revoked at any time by the European Parliament or by the Council. A decision of revocation shall put an end to the delegation of the power specified in that decision. It shall take effect the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.

 

4.  As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.

 

5.  A delegated act adopted pursuant to this Regulation shall enter into force only if no objection has been expressed either by the European Parliament or the Council within a period of two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or the Council.

 

Article 55

Committee Procedure

 

1.  The Commission shall be assisted by the common Committee ▌"Asylum, Migration and Internal Security Funds" hereby established▌. That Committee shall be a Committee within the meaning of Regulation (EU) No 182/2011.

 

2.  Where reference is made to this paragraph, Article 4 of Regulation (EU) No 182/2011 shall apply.

 

3.  Where reference is made to this paragraph, Article 5 of Regulation (EU) No 182/2011 shall apply. Where the Committee delivers no opinion, the Commission shall not adopt the draft implementing act, except for Article 14(4), Article 22(5), Article 40(2), Article 42 (6) and Article 48(4) of this Regulation.

 

Article 56

Review

 

On the basis of a proposal from the Commission, the European Parliament and the Council shall review this Regulation by 30 June 2020 at the latest.

 

Article 57

Entry into force

 

This Regulation shall enter into force on the day following that of its publication in the Official Journal of the European Union.

 

It shall apply from 1 January 2014.

 

This Regulation shall be binding in its entirety and directly applicable in the Member States.

 

Done at Brussels,

For the European Parliament  For the Council

The President  The President

ANNEX TO THE DRAFT LEGISLATIVE RESOLUTION

 

 

Statement by the Commission on the adoption of national programmes

 

"The Commission will use its best efforts to inform the European Parliament in advance of the adoption of the national programmes."

 

 

Statement by the Commission on Article 5 § 4, subparagraph 2, point b of Regulation 182/2011

 

"The Commission underlines that it is contrary to the letter and to the spirit of Regulation 182/2011 (OJ L 55 of 28.2.2011, p. 13) to invoke Article 5 § 4, subparagraph 2, point b) in a systematic manner. Recourse to this provision must respond to a specific need to depart from the rule of principle which is that the Commission may adopt a draft implementing act when no opinion is delivered. Given that it is an exception to the general rule established by Article 5 § 4 recourse to subparagraph 2, point b), cannot be simply seen as a "discretionary power" of the Legislator, but must be interpreted in a restrictive manner and thus must be justified."

 

 

14.9.2012

OPINION of the Committee on Budgets

for the Committee on Civil Liberties, Justice and Home Affairs

on the proposal for a regulation of the European Parliament and of the Council laying down general provisions on the Asylum and Migration Fund and on the instrument for financial support for police cooperation, preventing and combating crime, and crisis management

( COM(2011)0752 – C7‑0444/2011 – 2011/0367(COD) )

Rapporteur: Monika Hohlmeier

 

SHORT JUSTIFICATION

The home affairs budget

In June 2011 the European Commission presented its proposals on the Multiannual Financial Framework. This includes an overall budget for the home affairs area of EUR 10,9 billion for the period 2014-2020.

The amount covers spending on financial programmes and also funding for large-scale IT systems and the EU agencies active in the home affairs area[10].

 

Home affairs budget 2014-2020

EUR million (current prices)

Asylum and Migration Fund

including Resettlement Programme and European Migration Network

3,869

Internal Security Fund

including new large-scale IT systems

4,648

Existing large-scale IT systems and IT Agency

822

Subtotal

9,339

Agencies

(Europol, Frontex EASO, Cepol and EMCDDA)

1,572

Total

10,911

 

The legal framework of the two Funds

In order to simplify the funding structures in the home affairs area and to better align spending at EU level with the Union's strategic policy objectives, the Commission proposes to reduce the number of funds to two and establish horizontal provisions on the management of the funds. Hence, the two Funds function as much as possible with identical delivery mechanisms.

This Regulation on "general provisions on the Asylum and Migration Fund and on the instrument for financial support for police co-operation, preventing and combating crime, and crisis management " is therefore part of the framework for Union funding under two Funds:

·an Asylum and Migration Fund and

·an Internal Security Fund (consisting of an instrument for financial support for external borders and visa and an instrument for financial support for police cooperation, preventing and combating crime and crisis management).

This horizontal instrument, applicable to both the Asylum and Migration Fund and the two components of the Internal Security Fund (either directly or through cross-references), lays down the rules on programming, management and control, financial management reporting and evaluation.

This overall structure of four Regulations is necessary in the light of different voting rules in the Council stemming from variable geometry pursuant to Protocols 19 (on the Schengen acquis) and 21 (the position of the UK and Ireland in respect of the area of Freedom, Security and Justice) in the Treaties. By means of this horizontal Regulation, the overall number of provisions is reduced considerably than if they were repeated in each act.

The general provisions

This Regulation lays down obligations only of a financial and technical nature, such as rules on programming, management and control, financial management, clearance of accounts, closure of programmes and reporting and evaluation and delivery mechanisms, while the definition of policy objectives, eligible actions, the allocation of resources and the scope of the intervention for each specific policy area are dealt with in the three Specific Regulations.

Financial implications

As this Regulation only provides for general rules on the financing of expenditure, there are no appropriations foreseen. Instead, the Commission's proposal for the Multi-Annual Financial Framework includes a proposal of EUR 3,869 million for the Asylum and Migration Fund and of EUR 4,648 million for the Internal Security Fund (see table above current prices). At this, the Home Affairs policy is implemented mainly by shared management and actual day-to-day management is vested at national level.

The amendments

In addition, your rapporteur proposes to put a clear emphasis on the necessity of an EU added value of the funded activities. For this purpose, also the relevant competent EU agencies should be adequately consulted in the policy dialogue with Member States in preparation for establishment the national programmes.

In order to prevent the misuse of EU funds as much as possible, your rapporteur proposes to allow for unannounced on-the-spot controls and inspections. Further, for the purpose of an efficient and target-oriented spending of funds and in the light of each Member States's own contribution, your rapporteur proposes not to include an eligibility of emergency actions up to 100% but to always request a minimum co-financing by the Member State, even at a very low level.

With regard to ensuring the continuity of funding, your rapporteur proposes to provide for annual pre-financing.

AMENDMENTS

The Committee on Budgets calls on the Committee on Civil Liberties, Justice and Home Affairs, as the committee responsible, to incorporate the following amendments in its report:

 

Amendment    1

Draft legislative resolution

Paragraph 1 a (new)

 

Draft legislative resolution

Amendment

 

1a. Points out that the financial envelope specified in the legislative proposal constitutes only an indication to the legislative authority and cannot be fixed until agreement is reached on the proposal for a regulation laying down the multiannual financial framework for the years 2014-2020;

 

Amendment    2

Draft legislative resolution

Paragraph 1 b (new)

 

Draft legislative resolution

Amendment

 

1a. Recalls its resolution of 8 June 2011 on Investing in the future: a new Multiannual Financial Framework (MFF) for a competitive, sustainable and inclusive Europe1; reiterates that sufficient additional resources are needed in the next MFF in order to enable the Union to fulfil its existing policy priorities and the new tasks provided for in the Treaty of Lisbon, as well as to respond to unforeseen events; points out that even with an increase in the level of resources for the next MFF of at least 5% compared to the 2013 level only a limited contribution can be made to the achievement of the Union’s agreed objectives and commitments and the principle of Union solidarity; challenges the Council, if it does not share this approach, to clearly identify which of its political priorities or projects could be dropped altogether, despite their proven European added value;

 

_______________

 

1 Texts adopted, P7_TA(2011)0266

 

Amendment    3

Draft legislative resolution

Paragraph 1 c (new)

 

Draft legislative resolution

Amendment

 

1c. Emphasises that, in view of the tasks already identified and concluded by the Union, the Commission needs to reflect those policy priorities in a foresighted and adequate manner in the proposal;

 

Amendment    4

Draft legislative resolution

Paragraph 1 d (new)

 

Draft legislative resolution

Amendment

 

1d. Reiterates that the Lisbon Treaty provides for delegated acts only as non-legislative acts of general application relating to non-essential elements of a legislative act; therefore upholds its criticism of the widespread use of delegated acts and insists that any essential element must be laid down in the legislative act in question;

 

Amendment    5

Proposal for a regulation

Recital 2 a (new)

 

Text proposed by the Commission

Amendment

 

(2a) In its resolution of 8 June 2011 on Investing in the future: a new Multiannual Financial Framework (MFF) for a competitive, sustainable and inclusive Europe1, the European Parliament stressed the need for an integrated approach towards pressing immigration, asylum questions as well as towards the management of the external borders of the Union, with sufficient funding and support tools to handle emergency situations made available in a spirit of respect for human rights and solidarity amongst all Member States, respecting national responsibilities and a clear definition of tasks. It further notes that, in this regard, the increased challenges of FRONTEX, the European Asylum Support Office and the Funds on Solidarity and Management of Migration Flows need to be duly taken into consideration.

 

__________________

 

1 Texts adopted, P7_TA(2011)0266

Justification

Paragraph 107 of the resolution of 8 June 2011 "Investing in the future: a new Multiannual Financial Framework (MFF) for a competitive, sustainable and inclusive Europe"

 

Amendment    6

Proposal for a regulation

Recital 2 b (new)

 

Text proposed by the Commission

Amendment

 

(2b) In its resolution of 8 June 20111, the European Parliament further emphasised the need of developing better synergies between different funds and programs and points to the fact that the simplification of management of funds and allowing cross-financing enable the allocation of more funds to common objectives, welcomed the Commission's intention to reduce the total number of budgetary instruments in Home Affairs in a two pillar structure and where possible under shared management and expressed its belief that this approach should contribute significantly to an increased simplification, rationalisation, consolidation and transparency of the current funds and programmes. It stressed however the need to ensure that the different objectives of home affairs policies will not be mixed up.

 

__________________

 

1 Texts adopted, P7_TA(2011)0266

Justification

Paragraph 109 of the resolution of 8 June 2011 "Investing in the future: a new Multiannual Financial Framework (MFF) for a competitive, sustainable and inclusive Europe"

 

Amendment    7

Proposal for a regulation

Recital 3 a (new)

 

Text proposed by the Commission

Amendment

 

(3a) Spending of funds in this area should be better coordinated in order to assure complementarity, a better efficiency and visibility, as well as to achieve better budgetary synergies.

 

Amendment    8

Proposal for a regulation

Recital 3 b (new)

 

Text proposed by the Commission

Amendment

 

(3b) Improving implementation and quality of spending should constitute guiding principles for achieving the objectives of the Funds while ensuring optimal use of the financial resources.

 

Amendment    9

Proposal for a regulation

Recital 7

 

Text proposed by the Commission

Amendment

(7) External action should be consistent and coherent as set out in article 18(4) of TEU.

(7) External action should be consistent and coherent as set out in article 18(4) of TEU. The European Commission together with the EEAS should set up an effective mechanism to ensure such consistency.

 

Amendment    10

Proposal for a regulation

Recital 11

 

Text proposed by the Commission

Amendment

(11) Eligibility of expenditure under the national programmes should be determined by national law, subject to common principles. The starting and closing dates for the eligibility of expenditure should be defined so as to provide for uniform and equitable rules applying to the national programmes.

(11) Eligibility of expenditure under the national programmes should be determined by national law while being subject to common principles laid down in this Regulation. The starting and closing dates for the eligibility of expenditure should be defined so as to provide for uniform and equitable rules applying to the national programmes.

 

Amendment    11

Proposal for a regulation

Recital 12

 

Text proposed by the Commission

Amendment

(12) Technical assistance should enable the Member States to support the implementation of their national programmes and assist beneficiaries in complying with their obligations and Union law.

(12) Technical assistance is essential to enable the Member States to support the implementation of their national programmes, assist beneficiaries in complying with their obligations and Union law and in turn to increase the visibility of and accessibility to EU funds.

 

Amendment    12

Proposal for a regulation

Recital 13

 

Text proposed by the Commission

Amendment

(13) To ensure an adequate framework for providing rapidly emergency assistance, this Regulation should allow support for actions the expenditure of which was incurred before the application for such assistance was made, in accordance with the provision in the Financial Regulation1 which allows such flexibility in duly substantiated exceptional cases.

(13) To ensure an adequate framework for providing rapidly emergency assistance, this Regulation should allow support for actions the expenditure of which was incurred before the application for such assistance was made, in accordance with the provision in the Financial Regulation1 which allows such flexibility in duly substantiated exceptional cases.

____________

____________

1 Triennial revision of the Financial Regulation – Commission proposal COM(2010)0260 .

1 Regulation on the financial rules applicable to the annual budget of the Union ( COM(2010)815 final of 22.12.2010).

Justification

Wrong reference corrected

 

Amendment    13

Proposal for a regulation

Recital 16 a (new)

 

Text proposed by the Commission

Amendment

 

(16a) While the correct use of the funds is a core priority, the spending of funds in the policy areas concerned should be simplified. To this end, if the Member state's error rate within the implementation of this Regulation and the Specific Regulations related to it does not exceed 2%, the density of controls should be reduced.

 

Amendment    14

Proposal for a regulation

Recital 22

 

Text proposed by the Commission

Amendment

(22) The triennial revision of the Financial Regulation1 introduces changes in the shared management principles which have to be taken into account.

(22) The triennial revision of the Financial Regulation1 introduces changes in the shared management method which have to be taken into account.

_______________

_______________

1 Triennial revision of the Financial Regulation - Commission proposal COM(2010)0260 .

1 Regulation on the financial rules applicable to the annual budget of the Union ( COM(2010)815 final of 22.12.2010).

Justification

Shared management is not a principle of implementation, it is a method of implementation of the EUs Budget

 

Amendment    15

Proposal for a regulation

Recital 22 a (new)

 

Text proposed by the Commission

Amendment

 

(22a)Where the Commission implements the budget under shared management, implementation tasks should be delegated to Member States. The Commission and the Member States should respect the principles of sound financial management, transparency and non‑discrimination and ensure the visibility of Union action when they manage Union funds. To this end, the Commission and the Member States should fulfil their respective control and audit obligations, and assume the resulting responsibilities laid down in this Regulation. Complementary provisions should be laid down in sector-specific rules.

 

Amendment    16

Proposal for a regulation

Recital 27 a (new)

 

Text proposed by the Commission

Amendment

 

(27a) It is important to ensure sound financial management of the programme and its implementation in the most effective and user-friendly manner possible, while also ensuring legal certainty and the accessibility of the instrument to all participants. Since part of the activities under these funds are carried out under shared management, Member States should refrain from adding additional rules, which complicate the usage of funds for the beneficiary.

 

Amendment    17

Proposal for a regulation

Article 3 – paragraph 1

 

Text proposed by the Commission

Amendment

1. The Specific Regulations shall provide support, through national programmes, Union actions and emergency assistance, which complements national, regional and local intervention, pursuing the objectives of the Union.

1. The Specific Regulations shall provide support, through national programmes, Union actions and emergency assistance, which complements national, regional and local intervention, pursuing the objectives of the Union, and creating an EU added value.

Justification

The Union funding should always create and EU added value and not substitute national funding.

 

Amendment    18

Proposal for a regulation

Article 5 – paragraph 1

 

Text proposed by the Commission

Amendment

1. The Commission shall take appropriate measures ensuring that, when actions financed under the Specific Regulations are implemented, the financial interests of the European Union are protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective controls and, if irregularities are detected, by the recovery of the amounts wrongly paid and, where appropriate, by effective, proportionate and deterrent penalties.

1. The Commission shall take appropriate measures ensuring that, when actions financed under the Specific Regulations are implemented, the financial interests of the European Union are protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective controls and, if irregularities are detected, by the recovery of the amounts wrongly paid and, where appropriate, by effective, proportionate and deterrent penalties. Without prejudice to paragraph 3 of this Article, where the administrative requirements for the adequate implementation are not in place, the Commission shall take the appropriate measures to assist the Member State in establishing the necessary administrative structures.

 

Amendment    19

Proposal for a regulation

Article 5 – paragraph 4

 

Text proposed by the Commission

Amendment

4. Member States shall offer effective prevention against fraud, especially as regards the areas with a higher level of risk, and which shall act as a deterrent, having regard to the benefits as well as the proportionality of the measures.

4. Member States shall offer effective prevention against fraud, especially as regards the areas with a higher level of risk, and which shall act as a deterrent, having regard to the benefits as well as the proportionality of the measures. This may include unannounced on-the-spot controls and inspections.

Justification

In order to prevent the misuse of EU funds as much as possible, unannounced on-the-spot controls and inspections should be possible.

 

Amendment    20

Proposal for a regulation

Article 7 – paragraph 4 – subparagraph 2 (new)

 

Text proposed by the Commission

Amendment

4. Union actions, emergency assistance and technical assistance at the initiative of the Commission may be implemented

4. Union actions, emergency assistance and technical assistance at the initiative of the Commission may be implemented

- directly, by the Commission or through executive agencies;

- directly, by the Commission or through executive agencies;

- indirectly, by entities and persons other than Member States in accordance with Article [57] of the Financial Regulation.

- indirectly, by entities and persons other than Member States in accordance with Article [57] of the Financial Regulation.

 

The Commission remains responsible for the implementation of the Union budget in accordance with Article 317 TFEU and shall inform the European Parliament and the Council on the operations carried out by the entities under the second indent.

Justification

The amendment brings the wording in line with the revised Financial regulation.

 

Amendment    21

Proposal for a regulation

Article 8 – paragraph 2

 

Text proposed by the Commission

Amendment

2. Within the limits of the available resources, the emergency assistance may amount to 100% of the eligible expenditure.

2. Within the limits of the available resources and by way of derogation from Article 16, the emergency assistance may amount to more than 90% but not constitute 100% of the eligible expenditure.

Justification

In order to ensure the efficient and responsible spending and complementarity of EU funds, it is necessary that Member States always co-finance activities and thereby ensure target orientation of Union spending. In emergency cases, the eligibility of expenditure may need to exceed 90% but should not constitute 100%.

 

Amendment    22

Proposal for a regulation

Article 13 – paragraph 1

 

Text proposed by the Commission

Amendment

1. To launch the programming period, the Commission and each Member State shall have a policy dialogue on the national requirements and the contribution that the Union budget could provide to achieving these requirements, bearing in mind the base line situation in the Member State concerned and the objectives of the Specific Regulations. The policy dialogue shall result in the conclusion of agreed minutes or an exchange of letters which shall identify the specific needs and priorities of the Member State concerned and serve as the framework for the preparation of the national programmes.

1. To launch the programming period, the Commission and each Member State shall have a policy dialogue on the national requirements and the contribution that the Union budget could provide to achieving these requirements, bearing in mind the base line situation in the Member State concerned and the objectives of the Specific Regulations. The policy dialogue shall result in the conclusion of agreed minutes or an exchange of letters which shall identify the specific needs and priorities of the Member State concerned and serve as the framework for the preparation of the national programmes.

 

In order to ensure the necessary EU added value, the policy dialogue shall involve an adequate consultation of the competent Union agencies and serve as an opportunity for an exchange of views on Union actions.

In case of actions to be implemented in and in relation to third countries, such actions shall not be directly development oriented and the policy dialogue shall seek full coherence with the principles and general objectives of the Union external action and foreign policy as regards the country or region concerned.

In case of actions to be implemented in and in relation to third countries, such actions shall not be directly development oriented and the policy dialogue shall seek full coherence with the principles and general objectives of the Union external action and foreign policy as regards the country or region concerned.

Justification

In order to ensure the necessary EU added value of Union spending, both Member States and the competent EU agencies need to enter into a constructive dialogue on the identification of tasks and priorities. Therefore, the relevant competent EU agencies should be consulted in the preparation of the national programmes while at the same time Member States should have the opportunity to voice their ideas about Union actions.

 

Amendment    23

Proposal for a regulation

Article 14 – paragraph 2 – point c

 

Text proposed by the Commission

Amendment

(c) an appropriate strategy identifying the objectives to be pursued with the support of the Union budget, with targets for their achievement, an indicative time table and examples of actions envisaged to meet these objectives;

(c) an appropriate strategy identifying the objectives to be pursued with the support of the Union budget, with targets for their achievement, an indicative time table and examples of actions envisaged to meet these objectives; this strategy shall ensure, in each of the Member states, a fair and equitable distribution of funds - allocated under the Specific Regulations - in respect of each of the objectives as defined in the Specific Regulations;

 

Amendment    24

Proposal for a regulation

Article 14 – paragraph 6 a (new)

 

Text proposed by the Commission

Amendment

 

6a. All national programmes shall be approved by 31 December 2014.

 

Amendment    25

Proposal for a regulation

Article 22 – paragraph 1

 

Text proposed by the Commission

Amendment

1. Member States shall fulfil the management, control and audit obligations and assume the resulting responsibilities laid down in the rules on shared management set out in the Financial Regulation and this Regulation. In accordance with the principle of shared management, Member States shall be responsible for the management and control of national programmes.

1. Member States shall fulfil the management, control and audit obligations and assume the resulting responsibilities laid down in the rules on shared management set out in the Financial Regulation. In accordance with the method of shared management, Member States shall be responsible for the management and control of national programmes and the Commission remains responsible for the implementation of the Union budget in accordance with Article 317 TFEU.

Justification

The amendment brings the wording in line with the revised Financial regulation

 

Amendment    26

Proposal for a regulation

Article 31 – paragraph 2

 

Text proposed by the Commission

Amendment

2. Payments shall take the form of initial pre-financing, payments of the annual balance and the payment of the final balance.

2. Payments shall take the form of initial pre-financing, annual pre-financing, payments of the annual balance and the payment of the final balance.

Justification

In order to guarantee the continuity of funding, it is necessary to also provide annual pre-financing.

 

Amendment    27

Proposal for a regulation

Article 33 – title

 

Text proposed by the Commission

Amendment

Initial pre-financing arrangements

Initial and annual pre-financing arrangements

Justification

In order to guarantee the continuity of funding, it is necessary specify the timeframes of payments and to also provide for annual pre-financing.

 

Amendment    28

Proposal for a regulation

Article 33 – paragraph 1

 

Text proposed by the Commission

Amendment

1. Following the Commission decision approving the national programme, an initial pre-financing amount for the whole programming period shall be paid by the Commission. This shall represent 4% of the contribution from the Union budget to the national programme concerned. It may be split into two instalments depending on budget availability.

1. Following the Commission decision approving the national programme, an initial pre-financing amount for the whole programming period shall be paid by the Commission. This shall represent 6% of the contribution from the Union budget to the national programme concerned. It may be split into two instalments depending on budget availability within 6 months.

Justification

In order to guarantee the continuity of funding, it is necessary specify the timeframes of payments and to also provide for annual pre-financing.

 

Amendment    29

Proposal for a regulation

Article 33 – paragraph 1 a (new)

 

Text proposed by the Commission

Amendment

 

1a. An annual pre-financing amount of 5% of the total contribution from the Union budget to the national programme concerned shall be paid before February of each year of the Multi-annual Financial Framework.

Justification

In order to guarantee the continuity of funding, it is necessary specify the timeframes of payments and to also provide for annual pre-financing.

 

Amendment    30

Proposal for a regulation

Article 33 – paragraph 2

 

Text proposed by the Commission

Amendment

2. If a national programme is approved in 2015 or later, the instalments shall be paid in the year of approval.

2. Following the first year of entry into force of the Multi-annual Financial Framework, the instalments shall be paid not later than two months after the approval of the national programme depending on budget availability and provided that the necessary administrative structures are in place.

Justification

In order to guarantee the continuity of funding, it is necessary specify the timeframes of payments and to also provide for annual pre-financing

 

Amendment    31

Proposal for a regulation

Article 45 – paragraph 1

 

Text proposed by the Commission

Amendment

1. National programmes shall be submitted to a decommitment procedure established on the basis that amounts linked to a commitment which are not covered by the initial pre-financing referred to in Article 33 or a request for payment in accordance with Article 39 by 31 December of the second year following that of the budget commitment shall be decommitted.

1. National programmes shall be submitted to a decommitment procedure established on the basis that amounts linked to a commitment which are not covered by the initial pre-financing referred to in Article 33 or a request for payment in accordance with Article 39 by 31 December of the second year following that of the budget commitment shall be decommitted.

 

For the purposes of the decommitment, the Commission shall calculate the amount by adding one sixth of the annual budget commitment related to the 2014 total annual contribution to each of the 2015 to 2020 budget commitments.

Justification

COM and Member States should ensure that the national programmes for the ISF and AMF are adopted in 2014. However, in view of the possible difficulties of the first year of the MFR, the loss of CA related to shared management should be avoided and the decommitment rules should be adapted. Accordingly, the decommitment for the first MFR year should be undertaken by adding to each of the 2015 to 2020 budget commitments a sixth of the 2014 budget commitment.

 

Amendment    32

Proposal for a regulation

Article 45 – paragraph 1 a (new)

 

Text proposed by the Commission

Amendment

 

1a. By way of derogation from the first subparagraph of paragraph 1, the deadlines for decommitment shall not apply to the annual budget commitment related to the 2014 total annual contribution.

Justification

COM and Member States should ensure that the national programmes for the ISF and AMF are adopted in 2014. However, in view of the possible difficulties of the first year of the MFR, the loss of CA related to shared management should be avoided and the decommitment rules should be adapted. Accordingly, the decommitment for the first MFR year should be undertaken by adding to each of the 2015 to 2020 budget commitments a sixth of the 2014 budget commitment.

 

Amendment    33

Proposal for a regulation

Article 45 – paragraph 1 b (new)

 

Text proposed by the Commission

Amendment

 

1b. If the first annual budget commitment is related to the 2015 total annual contribution, by way of derogation from paragraph 1, the deadlines for decommitment shall not apply to the annual budget commitment related to the total annual contribution of 2015. In such cases, the Commission shall calculate the amount under the first subparagraph of paragraph 1 by adding one fifth of the annual budget commitment related to the 2015 total amount contribution to each of the 2016 to 2020 budget commitments.

Justification

In case the first budget commitment is related to 2015 and in view of the possible difficulties of the first year of the MFR, the loss of CA related to shared management should be avoided and the decommitment rules should be adapted. Accordingly, the decommitment for the first MFR year should be undertaken by adding to each of the 2016 to 2020 budget commitments a fifth of the 2015 budget commitment.

 

Amendment    34

Proposal for a regulation

Article 52 – paragraph 2 a (new)

 

Text proposed by the Commission

Amendment

 

2a. In the reports referred to in points (a) and (b) of paragraph 2, the European Commission shall provide concrete evidence, if available, of the complementarity and synergies achieved between the EU funds and the Members States' budgets and of the triggering effects on Member States of the EU budget in achieving the objectives of the Stockholm programme.

 

Amendment    35

Proposal for a regulation

Article 53 – subparagraph 2 (new)

 

Text proposed by the Commission

Amendment

 

In the reports referred to in Article 52 (2)(a) and (b), the European Commission shall provide concrete evidence, if available, of the complementarity and synergies achieved between the EU funds and the Members States' budgets and of the triggering effects on Member States of the EU budget in achieving the objectives of the Stockholm programme.

 

 

PROCEDURE

Title

General provisions - Asylum and Migration Fund and Internal Security Fund

References

COM(2011)0752 – C7-0444/2011 – 2011/0367(COD)

Committee responsible

       Date announced in plenary

LIBE

15.12.2011

 

 

 

Opinion by

       Date announced in plenary

BUDG

15.12.2011

Rapporteur

       Date appointed

Monika Hohlmeier

15.2.2012

Date adopted

6.9.2012

 

 

 

Result of final vote

+:

–:

0:

29

2

2

Members present for the final vote

Marta Andreasen, Richard Ashworth, Reimer Böge, Zuzana Brzobohatá, Jean-Luc Dehaene, Göran Färm, José Manuel Fernandes, Eider Gardiazábal Rubial, Jens Geier, Lucas Hartong, Jutta Haug, Monika Hohlmeier, Sidonia Elżbieta Jędrzejewska, Anne E. Jensen, Ivailo Kalfin, Sergej Kozlík, Jan Kozłowski, Alain Lamassoure, Giovanni La Via, George Lyon, Claudio Morganti, Jan Mulder, Juan Andrés Naranjo Escobar, Dominique Riquet, Derek Vaughan, Angelika Werthmann

Substitute(s) present for the final vote

Burkhard Balz, Maria Da Graça Carvalho, Edit Herczog, Jürgen Klute, Peter Šťastný, Georgios Stavrakakis

Substitute(s) under Rule 187(2) present for the final vote

Luigi Berlinguer

 

PROCEDURE

Title

General provisions - Asylum and Migration Fund and Internal Security Fund

References

COM(2011)0752 – C7-0444/2011 – 2011/0367(COD)

Date submitted to Parliament

15.11.2011

 

 

 

Committee responsible

       Date announced in plenary

LIBE

15.12.2011

 

 

 

Committee(s) asked for opinion(s)

       Date announced in plenary

BUDG

15.12.2011

 

 

 

Rapporteur(s)

       Date appointed

Lorenzo Fontana

9.2.2012

 

 

 

Discussed in committee

20.3.2012

10.7.2012

11.10.2012

27.11.2012

 

9.1.2014

 

 

 

Date adopted

9.1.2014

 

 

 

Result of final vote

+:

–:

0:

40

9

0

Members present for the final vote

Jan Philipp Albrecht, Roberta Angelilli, Edit Bauer, Emine Bozkurt, Salvatore Caronna, Philip Claeys, Carlos Coelho, Ioan Enciu, Frank Engel, Cornelia Ernst, Tanja Fajon, Kinga Gál, Kinga Göncz, Nathalie Griesbeck, Sylvie Guillaume, Salvatore Iacolino, Sophia in ‘t Veld, Teresa Jiménez-Becerril Barrio, Timothy Kirkhope, Baroness Sarah Ludford, Svetoslav Hristov Malinov, Véronique Mathieu Houillon, Anthea McIntyre, Claude Moraes, Antigoni Papadopoulou, Judith Sargentini, Birgit Sippel, Csaba Sógor, Renate Sommer, Wim van de Camp, Axel Voss, Renate Weber, Cecilia Wikström, Tatjana Ždanoka, Auke Zijlstra

Substitute(s) present for the final vote

Alexander Alvaro, Lorenzo Fontana, Mariya Gabriel, Stanimir Ilchev, Ulrike Lunacek, Hubert Pirker, Zuzana Roithová, Joanna Senyszyn, Marie-Christine Vergiat

Substitute(s) under Rule 187(2) present for the final vote

Leonardo Domenici, Christian Engström, Enrique Guerrero Salom, Nadja Hirsch, Olle Ludvigsson

Date tabled

13.1.2014

 

 

[1] OJ C 299, 4.10.2012, p. 108.
[2] OJ C 277, 13.9.2012, p. 23.
[3]* Amendments: new or amended text is highlighted in bold italics; deletions are indicated by the symbol ▌.
[4]  OJ C , , p. .
[5]  OJ C , , p. .
[6]  ▌Regulation 966/2012
[7]  ▌ Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002.
[8]  OJ L 55, 28.2.2011, p. 13.
[9]  OJ L 83, 27.3.1999, p. 1.
[10] source: Communication of the European Commission "Building an open and secure Europe: the home affairs budget 2014 - 2020"- COM(2011)0749